Archival unit 201
The National School ⟦line⟧ Baghdad on Telephone Number: 4418 19 Received from Mr. ⟦illegible⟧ the amount of ⟦illegible⟧ Dinars ⟦illegible⟧ Fils And that is for ⟦illegible⟧ for the year ⟦illegible⟧ Accountant ⟦red checkmark⟧
Receipts, Girl’s School; Construction Bills, Menahem S. Daniel's Clinic
View interactive document pageThese archival materials contain handwritten notes and receipts paid by Hadiah Munchi Salih Girls School for various services: restoration, worker payments, revenues and expenses, bidding list for rubble sale, electrical repair, and an amount of state tax. Also included are bills for construction of Menahem S. Daniel's clinic: plans for the construction, building, security and property tax. It also includes bills belonging to the National School: construction, furniture plans, doors, and maintenance.
The National School ⟦line⟧ Baghdad on Telephone Number: 4418 19 Received from Mr. ⟦illegible⟧ the amount of ⟦illegible⟧ Dinars ⟦illegible⟧ Fils And that is for ⟦illegible⟧ for the year ⟦illegible⟧ Accountant ⟦red checkmark⟧
Electric Carpentry Factory Owned by Abdul Hadi Mahdi Al Shaikh Omar Street Abu Saifian 74/149 Abu Saifian 74 G 149 Telephone No. ⟦line⟧ Telephone No. ⟦line⟧ Baghdad 9 / 4 / 1949 Baghdad / / 19 To the honorable: The National School Fils | Dinar | Minute | Hour | Price | Notes 1070 | 255 | | | | For repairman fees 050 | | | | | Bridle bit ⟦illegible⟧ 1/120 | | | | | Only one dinar and one hundred and twenty fils No more Paid in cash Abdul Hadi Mahdi 4 / 12 / 949 Please pay the amount Signature
Jewish Schools Committee BAGHDAD ⟦line⟧ Jewish Schools Committee Baghdad Jewish Hospitals Committee BAGHDAD JEWISH HOSPITALS COMMITTEE 19/2/950 Number: 159/7/M Date: 21 / 2 / 950 2610 622 5910 15760 Directorate of the National School Your letter No. 1318 dated 10 / 2 / 1950 We approve the sale of the iron water tank (tanki) for the amount of ten dinars as your school no longer needs it. ⟦signature⟧ The President A copy to:- The Honorable Presidency of the Hospitals Committee, and we enclose herewith a copy of the National School's letter for information. The Accountant Reviewed this letter and sent it ⟦illegible⟧ and the news ⟦illegible⟧ by filing it Special documents ⟦signature⟧ 2/28
The National School Number - 1318 Date 10 / 2 / 950 His Excellency, Chairman of the Israeli Schools Committee After greetings, Among the furniture present in this school was an iron water tank (tanky) which we sold through the Hospitals Committee during construction for the amount of ten dinars due to our lack of need for it. The aforementioned committee has accounted for this amount as part of the expenses for the water drinking facilities it constructed. We hope you take note of this, and please accept our highest respect. Signature / School Principal ⟦illegible stamp⟧
Heirs of K. Moshe Sofer and Shua Sassoon Zeloof - Baghdad Contractors 76 Fils: ⟦line⟧ Dinar: 150 We received from the esteemed Israeli Spiritual Council in Baghdad An amount of one hundred and fifty Dinars only For the renovation of the National School in Baghdad As per check No. 827772 on the Ottoman Bank dated 20/1/950 Date: 5 / 2 / 1950 On behalf of Shua Zeloof Kingdom of Iraq 8 Fils Revenue Fee 9
Gurji Moussa Sofer and Shua Sassoon Zeloof - Baghdad Contractors 73 Fils | Dinar ⟦line⟧ | 950 We received from the Israeli Lay Council in Baghdad The sum of one hundred and fifty Dinars only For the renovation of the Al-Wataniya School in Baghdad As per check number 874748 at the Ottoman Bank dated 12/7/49 Date 12 / 20 / 949 8 Fils ⟦signature⟧
Fils and Dinar 38/908 (Only thirty-eight Dinars and nine hundred and eight Fils) I received from the Presidency of the Jewish Community in Baghdad the mentioned amount according to the check numbered 822782 and dated on 12/29/1949 on the Ottoman Bank in Baghdad, and that is for the fees of preparing maps and obtaining the necessary permit for fencing the wing of the National School and the annex and the expenses of arrival Baghdad on 12/29/1949 The Engineer ⟦signature⟧ Max Rosenfeld
List of costs for preparing plans and designs and extracting the necessary permit for the construction of the National School wing ⟦line⟧ Fils | Dinar 260 | 6 | Permit fee 150 | - | Janitor's tip 500 | 2 | Miscellaneous expenses --- | 20 | Professional fees 910 | 28 | Total The total is only twenty-eight dinars and nine hundred and ten fils and no more The Engineer ⟦signature⟧ Hani Rosenfeld Baghdad on 12/27/1949 The Accountant Please disburse the amount mentioned above on the account of the National School 12/28 ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
The Lay Council of the Israelite Community in Baghdad Administration of the National School Receipt Number 33 Receipt: No. ⟦illegible⟧ Fils: 500 Dinar: 22 I have received from: The Ukrainian Hospitals Committee the above-mentioned amount Amounting to: Twenty-two dinars and five hundred fils For: Painting expenses in the school building Position: Director Signature ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦...⟧ ⟦illegible⟧ ⟦...⟧ ⟦illegible⟧ ⟦...⟧ ⟦illegible⟧ ⟦...⟧ ⟦...⟧ ⟦illegible⟧ ⟦...⟧ ⟦illegible⟧ ⟦...⟧ ⟦illegible⟧ ⟦...⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ | ⟦illegible⟧ ⟦illegible⟧ | ⟦illegible⟧ | 20 | 200 ⟦illegible⟧ | ⟦illegible⟧ | 19 | 200 ⟦illegible⟧ | ⟦illegible⟧ | 2 | 200 ⟦illegible⟧ | ⟦illegible⟧ | | ⟦illegible⟧ | ⟦illegible⟧ | | ⟦illegible⟧ | ⟦illegible⟧ | 7 | ⟦illegible⟧ | ⟦illegible⟧ | 3 | Seven ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ 21 / 12 / ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
The National School ⟦line⟧ Baghdad Telephone Number 4468 19 ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ Iraq 8 Fils ⟦illegible⟧
Gurji Moshi Sofer and Shua Sassoon Zalouf - Baghdad Contractors Fils: ⟦line⟧ Dinar: 150 71 We received from the esteemed Israeli Spiritual Council An amount of one hundred and fifty Dinars only As an advance for the construction of the National School in Baghdad According to Ottoman Bank check number 822742 dated 17 / 11 / 949 Date 20 / 11 / 949 Kingdom of Iraq 8 Fils ⟦signature⟧ 19 / 11 / 949
List of expenses for the reconstruction of the National School Fils | Dinar | 750 | | Blacksmith's fee for installing a pipe and a faucet ⟦line⟧ | 4 | Cleaning fees for 4 lorries by Mr. Ezra Haddad 160 | 4 | Workers' fees for transporting soil to the school 235 | 1 | Fee for obtaining a map, 2 deeds, and stamps ⟦line⟧ | 3 | Fees for obtaining a certificate of status and professional fees via Master Mahmoud 445 | 11 | Fees for obtaining a map 300 | | Writing paper 890 <del>⟦illegible⟧</del> 24 Only twenty-four dinars and eight hundred and ninety fils and no more. ⟦signature⟧ Accountant A/A ⟦To be paid on account after auditing⟧ 11/12 ⟦signature⟧ Approved 12/12 ⟦signature⟧
Khedhouri Munshi Al-Saleh Bank Fils | Dinar 150 | 1 | Worker's wage ⟦illegible⟧ | ⟦illegible⟧ | Inspection fee for the construction of Khan La'liya 40 | ⟦illegible⟧ | Inspection assessment stamp 10 | ⟦illegible⟧ | Debris stamp for La'liya 25 | ⟦illegible⟧ | Car for inspection ⟦illegible⟧ | 5 | Examination fees 850 | ⟦illegible⟧ | Examination stamp ⟦illegible⟧ | 4 | Engineer's fees ⟦line⟧ 11/445 Thirteen dinars and four hundred and forty-five fils Only, I have received the mentioned amount ⟦illegible⟧ 10/20/1954
Accounting 37 A Receipts for Dirhams collected for the government Volume Number: 71942 Serial Number: 45 Fils/Dinar: 15/ - Department Name: ⟦illegible⟧ Received from: Head of the Jewish Community Amount: Fifteen Dinars and ⟦illegible⟧ Fils On account of: Shroud preparation Signature of the recipient: ⟦signature⟧ Job Title: ⟦illegible⟧ Date: 27 / 8 / ⟦illegible⟧ ⟦illegible handwriting in blue ink across the form⟧
Fils Dinar Map Expense 250 ⟦line⟧ Drawing a map 200 ⟦line⟧ Stamp and stamp service 200 ⟦line⟧ Car allowance for the engineer 700 ⟦line⟧ Kamal the engineer's meal ⟦line⟧ 1350 2000 ⟦line⟧ ⟦illegible⟧ Mahmoud chicken 900 ⟦line⟧ 3350 Mahmoud 250 / ⟦illegible⟧ Only three dinars ⟦illegible⟧
Accounting 37 "A" Record Number 71918 Receipts in Dirhams collected for the government Serial Number: 43 Fils / Dinar: ⟦line⟧ / 250 Department Name: Education Received from: Head of the Jewish Community Amount: One Dinar and two hundred and fifty Fils On account of: Car gasoline Date: 3 / 11 / 949 Signature of the recipient: Job Title: ⟦illegible⟧ ⟦signature⟧ Baghdad Land Registry
Fils | Dinar 200 | 7 200 | 2 95 40 500 ⟦line⟧ 10235 List fee Number of bonds Stamps Stamps Fees Brokerage fee <del>⟦illegible⟧</del>
Company of Gurji Moshi Sofer and Shoa Sassoon Zilkha - Baghdad Contractors 67 Fils | Dinar ⟦line⟧ | 150 Received from: The Honorable Israeli Community Council The sum of: One hundred and fifty Dinars only For: Advance payment for the construction of Al-Rusafa School in Baghdad Per: Check on Ottoman Bank No. 829100 dated 2/11/949 Date: 2/11/949 Iraq 8 Fils On behalf of Shoa Sassoon ⟦illegible⟧ 249 11/2
Heirs of Gurji Moshi Sofer and Shua Sassoon Zeloof Baghdad Contractors 64 Fils: ⟦illegible⟧ Dinar: 1000 Received from: The Jewish Lay Council in Baghdad An amount of: One thousand Dinars only Against check number: 84998 on the Ottoman Bank dated 24 / 1 / 49 Under: Aid for the reconstruction of the National School in Baghdad Date: 7 / 10 / 949 Kingdom of Iraq 8 Fils 1 7 / 10
Rashid Arif & Co. - Baghdad RASHID ARIF & Co. - Baghdad No.: Baghdad: 194 Received From: Iraq Dinars: in payment of: I.D.: ⟦line⟧ P.P. Rashid Arif & Co.
Rashid Arif & Partners 107 Al-Mustansir Street Telephone No.: Baghdad 7587 and 4925 Telegraphic Address: RESCO No.: 79 Baghdad on: September 27, 1949 Sold to: The Honorable Members of the Lay Council of the Israelite Community in Baghdad Dinar | Fils For drilling and installing 18 piles at a price of 10/- (ten) Dinars per pile | 180 | - For completing the finishing, reinforcement, and casting of 18 piles for a total depth of 535 feet at a price of (500) five hundred Fils per foot of depth | 267 | 500 Total | 447 | 500 Only four hundred and forty-seven Dinars and five hundred Fils ⟦stamp with signature⟧ ⟦illegible signature⟧ 30/9/49
First Party - Mr. Eliyahu Hayyim Tawfiq - President of the Lay Council of the Israelite Community in Baghdad, in addition to his position. Second Party - Mr. Sheikh Zal⟦line⟧r An agreement has been reached between the two parties to construct the northern wing starting from above the foundation in the National School in Baghdad located in the Qanbar Ali neighborhood, numbered 52/103, according to the following conditions:- First - The purpose of this undertaking is to carry out the construction works and provide the necessary materials in full to build the section starting from above the foundations for the aforementioned wing, according to the conditions below and the plans attached to this contract. ⟦illegible⟧ in full to build the section starting from above the foundations for the aforementioned wing, according to the conditions below and the plans attached to this contract. Second - The First Party has advanced to the Second Party an amount of 1000/- Dinars (One Thousand Dinars) by check number 829098 dated 10/4/1949 drawn on the Ottoman Bank in Baghdad as an advance for bringing a portion of the materials necessary for the work, and this amount will be deducted from the final account. Third - The First Party must obtain the necessary permits from the competent authorities for the mentioned engineer and pay the fees for that. Fourth - The prices agreed upon between the two parties are as shown in the table attached to this contract, and the final account shall be conducted according to the measurement of the completed works to the satisfaction of the First Party or his representative according to the prices listed in the attached table. If it becomes necessary to purchase some of the required materials for use in the work or to perform some works that do not have a price in the attached table for ⟦...⟧ Fourth - The prices agreed upon between the two parties are as shown in the table attached to this contract, and the final account shall be conducted according to the measurement of the completed works to the satisfaction of the First Party or his representative according to the prices listed in the attached table. If it becomes necessary to purchase some of the materials for use in the work or to perform some works that do not have a price in the attached table for that on behalf of the First Party, a commission of ten percent shall be calculated for the Second Party on the amounts spent in this regard. Fifth - If any work appears contrary to the maps or any fraudulent work, the Second Party must remove it and reconstruct it again as required at his own expense, and he has no right to claim any compensation from the First Party for that. Sixth - The second party must use materials of the best type available locally and must use English type cement only for all works that require cement, and the gypsum and sand must be clean and free from foreign materials. Seventh - The first party undertakes to pay the construction costs in monthly installments, each amounting to 150/- dinars (one hundred and fifty dinars) starting from 11/1/1949 until the completion of paying all that is requested by the second party for its work, and the first party also undertakes to pay the legal interest on any amount delayed in payment. Eighth - If it becomes necessary to perform work for which there is no price in the price schedule, an agreement must be reached on the price of that work between the two parties before starting the mentioned work. Ninth - If a dispute arises between the two parties, they must agree on appointing a third person agreed upon between the two parties to resolve the existing dispute, and his judgment shall be binding on both parties. ⟦signature⟧ Correct Copy (To be continued)
Work Price List for Constructing a Wing in the National School in Baghdad Type of Work | Cubic Meter | Fils | Dinar | Amount in Writing 1 - Dry Excavations | Cubic Meter | 200 | | (Two hundred fils) 2 - Wet Excavations | Cubic Meter | 500 | | (Five hundred fils) 3 - External Soil Backfill | Cubic Meter | 400 | | (Four hundred fils) 4 - Internal Soil Backfill | Cubic Meter | 150 | | (One hundred and fifty fils) 5 - Spreading crushed stone and compaction | <del>Cubic</del> Square Meter | 150 | | (One hundred and fifty fils) 6 - Spreading a plastic layer | <del>Cubic</del> Square Meter | 400 | 1 | (One dinar and four hundred fils) 7 - Reinforced concrete 1-2-4 with brick and gypsum molds | Cubic Meter | 000 | 16 | (Sixteen dinars) 8 - Reinforced concrete 1-2-4 for facades | Cubic Meter | 000 | 18 | (Eighteen dinars) 9 - Reinforced concrete 1-2-4 with molds for stairs | Cubic Meter | 000 | 18 | (Eighteen dinars) 10 - Reinforced concrete for flooring, 8 cm thickness, mix 1-2-4 | Square Meter | 000 | 1 | (One dinar) 11 - Brickwork with fired bricks and 1-4 cement | Cubic Meter | 750 | 3 | (Three dinars and seven hundred fifty) 12 - Brickwork with gypsum | Cubic Meter | 000 | 3 | (Three dinars) 13 - Parapet wall with brick and gypsum | Square Meter | 600 | | (Six hundred fils) 14 - Brick floor work in rail pattern with pointing, without cement | Square Meter | 500 | | (Five hundred fils) 15 - Flat brick floor work with cement pointing | Square Meter | 400 | | (Four hundred fils) 16 - Painting and installing steel beams for the ceiling | Per Ton | 000 | 6 | (Six dinars) 17 - ⟦The same⟧ for facades | Per Ton | 000 | 7 | (Seven dinars) 18 - Plain tile flooring work | Square Meter | 750 | | (Seven hundred fifty fils) 19 - Installing porcelain tile pieces | Square Meter | 000 | 1 | (One dinar) 20 - Installing plain tile pieces for flooring | Square Meter | 450 | | (Four hundred fils) 21 - Gypsum plastering, two coats and fermented | Square Meter | 120 | | (One hundred and twenty fils) 22 - Cement plastering 1-3 | Square Meter | 350 | | (Three hundred fifty fils) 23 - Leveling, waxing, and finishing | Square Meter | 500 | | (Five hundred fils) 24 - Cement pointing | Square Meter | 065 | | (Sixty-five fils) 25 - Gypsum priming | Square Meter | 040 | | (Forty fils) 26 - Supplying and installing a railing | Square Foot | 350 | | (Three hundred fifty fils) 27 - Digging and building a cesspool | Per unit | 000 | 15 | (Fifteen dinars) 28 - Supplying and installing teak wood doors | Square Foot | 700 | | (Seven hundred fils) 29 - Supplying and installing steel windows with hardware | Square Foot | 350 | | (Three hundred fifty fils) 30 - Brick masonry for the outer face | Square Meter | 400 | | ( ⟦...⟧ ) ⟦signature⟧ ⟦signature⟧