Page 201
The Lay Council of the Jewish Community
in Baghdad
Administration of the National School
Receipt Number 33
⟦27 / 10 / 54⟧
Receipt
Fils 500
Dinars 22
I have received from the Jewish Hospitals Committee the amount written above
being twenty-two Dinars and five hundred Fils
for the expenses of painting the school building
Position: Director
Signature ⟦signature⟧
Page 204
71
Gurji Moshi Sofer and Shua Sasson Zalouf - Baghdad
Contractors
Fils | Dinar
⟦line⟧ | 150
Received from: The Honorable Israeli Spiritual Council
An amount of: One hundred and fifty Dinars only
For: An advance on the construction of the National School in Baghdad
Per: Ottoman Bank check No. 274282 dated 11/7/949
Date: 11/7/949
Kingdom of Iraq
8 Fils
⟦illegible signature⟧
150
Page 205
List of expenses for the reconstruction of the National School
Fils | Dinar |
750 | | Blacksmith's fee for installing a pipe and a faucet
⟦line⟧ | 4 | Cleaning fees for 4 lorries by Mr. Ezra Haddad
160 | 4 | Workers' fees for transporting soil to the school
235 | 1 | Fee for obtaining a map, 2 deeds, and stamps
⟦line⟧ | 3 | Fees for obtaining a certificate of status and professional fees via Master Mahmoud
445 | 11 | Fees for obtaining a map
300 | | Writing paper
890 <del>⟦illegible⟧</del> 24
Only twenty-four dinars and eight hundred and ninety fils and no more.
⟦signature⟧
Accountant
A/A
⟦To be paid on account after auditing⟧
11/12
⟦signature⟧
Approved
12/12
⟦signature⟧
Page 207
Accounting 37 A
Receipts in Dirhams collected for the government
Volume number 71942
Department name: ⟦Baghdad Tabu⟧
Fils/Dinar: 540 / 5
Sequence number: 54
Received from: ⟦Sayyid Latif Al-Sayyid Ibrahim⟧
Amount: ⟦five dinars⟧ dinar and ⟦540⟧ fils
Account of: ⟦Registration fee⟧
Signature of the collector ⟦signature⟧
Job title ⟦...⟧
Date ⟦20-7-1948⟧
Page 208
Map Expense | Dinar | Fils
Map drawing fee | | 250
Stamp and stamp service | | 200
Carriage for the engineer | | 200
Kamal the engineer's share | | 700
| 1 | 350
⟦By⟧ Mahmoud Al-Hajj ⟦illegible⟧ | 2 | 000
| 3 | 350
Mahmoud
⟦Only⟧ three dinars ⟦illegible⟧
Page 209
Volume Number 71918
Accounting 37
Receipts for Currencies Collected for the Government
Baghdad Land Registry (Tapu)
Serial Number: 43
Fils/Dinar: 1/250
Department Name: Tapu
Received from: Head of the Jewish Community
Amount: One Dinar and two hundred and fifty Fils
On account of: Stamp duty
Signature of the Collector
⟦signature⟧
Job Title
⟦illegible⟧
Dated 4/11/949
Page 210
| Dinar | Fils
List fee | 2 |
Bonds number 2 | 2 | 500
Stamps | | 95
Stamps | | 40
Wages | 5 | 600
10235
Nabiyal al-Dallal
⟦signature⟧
Page 211
Gurji Moshi Sofer and Shua Sasson Zelouf - Baghdad
Contractors
67
Fils | Dinar
⟦line⟧ | 150
We have received from the Honorable Israeli Lay Council
the amount of one hundred and fifty Dinars only
as an advance on the account for building the Kindergarten school in Baghdad
per check on Ottoman Bank No. 829100 dated 2 / 11 / ⟦1949⟧
Date 2 / 11 / 949
Iraq
8 Fils
POSTAGE & REVENUE
⟦Shua Zelouf⟧
⟦Gurji Moshi⟧
249
Page 212
64
Gurji Moshi Sofer and Shua Sasson Zelouf - Baghdad
Contractors
1
Fils | Dinar
--- | 1000
We received from the Israeli Spiritual Council in Baghdad
The sum of one thousand dinars only
Against check No. 84998 on the Ottoman Bank dated 24/10/49
According to a transfer for the renovation of Al-Wataniya School in Baghdad
Date 7/10/949
Kingdom of Iraq
8 Fils
10/7
Page 213
Rashid Arif & Co. - Baghdad
RASHID ARIF & Co. - Baghdad
No. ⟦line⟧ Baghdad ⟦line⟧ 194
Received From ⟦line⟧
Iraq Dinars ⟦line⟧
in payment of ⟦line⟧
⟦for the price of ...⟧
⟦line⟧
I.D. ⟦line⟧
⟦red mark⟧
P.P. Rashid Arif & Co.
Page 216
Work Price List for Constructing a Wing in the National School in Baghdad
Type of Work | Cubic Meter | Fils | Dinar | Amount in Writing
1 - Dry Excavations | Cubic Meter | 200 | | (Two hundred fils)
2 - Wet Excavations | Cubic Meter | 500 | | (Five hundred fils)
3 - External Soil Backfill | Cubic Meter | 400 | | (Four hundred fils)
4 - Internal Soil Backfill | Cubic Meter | 150 | | (One hundred and fifty fils)
5 - Spreading crushed stone and compaction | <del>Cubic</del> Square Meter | 150 | | (One hundred and fifty fils)
6 - Spreading a plastic layer | <del>Cubic</del> Square Meter | 400 | 1 | (One dinar and four hundred fils)
7 - Reinforced concrete 1-2-4 with brick and gypsum molds | Cubic Meter | 000 | 16 | (Sixteen dinars)
8 - Reinforced concrete 1-2-4 for facades | Cubic Meter | 000 | 18 | (Eighteen dinars)
9 - Reinforced concrete 1-2-4 with molds for stairs | Cubic Meter | 000 | 18 | (Eighteen dinars)
10 - Reinforced concrete for flooring, 8 cm thickness, mix 1-2-4 | Square Meter | 000 | 1 | (One dinar)
11 - Brickwork with fired bricks and 1-4 cement | Cubic Meter | 750 | 3 | (Three dinars and seven hundred fifty)
12 - Brickwork with gypsum | Cubic Meter | 000 | 3 | (Three dinars)
13 - Parapet wall with brick and gypsum | Square Meter | 600 | | (Six hundred fils)
14 - Brick floor work in rail pattern with pointing, without cement | Square Meter | 500 | | (Five hundred fils)
15 - Flat brick floor work with cement pointing | Square Meter | 400 | | (Four hundred fils)
16 - Painting and installing steel beams for the ceiling | Per Ton | 000 | 6 | (Six dinars)
17 - ⟦The same⟧ for facades | Per Ton | 000 | 7 | (Seven dinars)
18 - Plain tile flooring work | Square Meter | 750 | | (Seven hundred fifty fils)
19 - Installing porcelain tile pieces | Square Meter | 000 | 1 | (One dinar)
20 - Installing plain tile pieces for flooring | Square Meter | 450 | | (Four hundred fils)
21 - Gypsum plastering, two coats and fermented | Square Meter | 120 | | (One hundred and twenty fils)
22 - Cement plastering 1-3 | Square Meter | 350 | | (Three hundred fifty fils)
23 - Leveling, waxing, and finishing | Square Meter | 500 | | (Five hundred fils)
24 - Cement pointing | Square Meter | 065 | | (Sixty-five fils)
25 - Gypsum priming | Square Meter | 040 | | (Forty fils)
26 - Supplying and installing a railing | Square Foot | 350 | | (Three hundred fifty fils)
27 - Digging and building a cesspool | Per unit | 000 | 15 | (Fifteen dinars)
28 - Supplying and installing teak wood doors | Square Foot | 700 | | (Seven hundred fils)
29 - Supplying and installing steel windows with hardware | Square Foot | 350 | | (Three hundred fifty fils)
30 - Brick masonry for the outer face | Square Meter | 400 | | ( ⟦...⟧ )
⟦signature⟧
⟦signature⟧
Page 217
(Before it) 2
Tenth - Agreement has been reached between the two parties, and this contract was drafted in two copies to be
one in the hands of each of the two parties.
Second Party | First Party
Shu'a Zalouf | Eliyahu Hayyim Tawfiq
| President of the Lay Council of the Community
| Israeli in Baghdad in addition to his office
⟦signature⟧
⟦stamp and signature⟧
Baghdad on 7 / 10 / 1949
Page 218
<del>Iraq Finance 8 fils</del>
<del>Iraq Finance 8 fils</del>
<del>Iraq Finance 8 fils</del>
<del>Iraq Finance 8 fils</del>
<del>Iraq Finance 8 fils</del>
<del>Iraq Finance 8 fils</del>
<del>Iraq Finance 8 fils</del>