Description

These are documents from the Baghdadi Jewish community and schools. The majority of the documents are a contract agreement between the Administrative Committee for Iraqi Jews and a general contractor to build another classroom and additional storage in the Frank Iny School (1956-1957). This includes the general contract; ledgers of schedules, materials, and costs; and design plans, including front elevation, done by Saleh Joseph. One section is correspondence between the Jewish Lay Council and all Jewish schools regarding teacher certifications and curricula (1931-1933).

Metadata

Archive Reference
IJA 3099
Item Number
12179
Date
Approx. January 1, 1931 to December 31, 1940
Languages
Arabic, English
Keywords
Chart, Financial, Illustration, Rahel Shamoon School, Revenue Stamp, Teachers, Ledger, File Folder, Contract, Typed, Baghdadi Jewish Community, School Material, Legal, Ink Stamp, Engineering, Administrative Committee for Iraqi Jews, Letterhead, Jewish Lay Council, President of the Jewish Community, Frank Iny School, Correspondence, Architectural Plans, Annotation, Handwritten, Education

AI English Translation, Pages 1-25

Archival unit 1

12.55
9.90
25.40
12.85
10.20
5.00
5.00
7.10
3.80
1.60
3.80
.25
.25
.25
.25
.25
.25
.25
.25
.25

Archival unit 2

Date | Design and Supervision By | Scale
24.5.57 | Saleh Joseph | 1 : 100
up
.25
3.85
.25
1.60
7.10
.25
.25
5.65
.25
3.80
.25
3.75
Front Elevation

Archival unit 3

Frank Iny School
Intermediate & Primary
Baghdad
Telephone No. 91693
FRANK INY SCHOOL
INTERMEDIATE & PRIMARY
Baghdad
Telephone No. 91693
No.: F / 71 / 57
Date: 22 / 3 / 1957
No.:
Date:
Presidency of the Administrative Committee of the Jewish Community in Baghdad
Greetings,
Further to our letter No. F/60/57 dated 10/3/1957
We have no objection to paying the amounts due to the contractor Mr.
Sassoon Shamoon for the school building, provided he completes the simple
remaining repairs regarding the painting and the roof of the drinking water house.
Please accept our highest respect,
⟦illegible⟧
The Manager

Archival unit 4

1957 / 3 / 7
Honorable Chairman of the Administrative Committee
Subject: The new building at Frank Iny School

The works on the new building at Frank Iny School, including materials and all
other expenses, have reached 2110.122 Dinars (only two thousand one hundred and ten Dinars and one
hundred and twenty-two Fils). Therefore, I request Your Honor to settle the remaining balance owed by the community after
deducting the advances and after receiving a letter from the Principal of Frank Iny School informing you
of the provisional receipt of the building according to the terms of the contract concluded between Your Honor
and the contractor Mr. Salloum Shamoun.
This is for your consideration.
Engineer
Saleh Yousef
1- A copy of it to the community.
2- = = to Mr. Abdullah Obadia, Principal of School
Frank Iny to take the necessary action.

Archival unit 5

(1)
Schedule of quantities and prices for the survey of the new building in Frank Aini
Amount
Dinar | Fils | Price
Dinar | Fils | Quantity and Description | Details
20 | ... | Lump sum | - | 1- Planning, site cleaning, and leveling
1 | 550 | - | 250 | 6.20 m3 | 2- Excavations
21 | 009 | 4 | 700 | 4.47 m3 | 3- Reinforced concrete for foundations
67 | 800 | 4 | ... | 16.95 m3 | 4- Brickwork with cement
9 | 710 | 1 | ... | 9.71 m2 | 5- Damp-proof course (DPC)
3 | 905 | - | 500 | 7.81 m2 | 6- Damp-proof plastering
268 | 440 | 4 | ... | 67.11 m3 | 7- Brickwork with gypsum
66 | 576 | - | 800 | 83.17 m2 | 8- Partitions with gypsum
10 | 500 | 20 | ... | 7.50 | 9- Reinforced concrete
57 | 088 | - | 400 | 142.72 m2 | 10- Leveling, bitumen, and gravel
18 | 684 | - | 400 | 246.71 m2 | 11- Filling
6 | 220 | - | 400 | 15.80 m2 | 12- Cement plastering for walkways
172 | 992 | - | 250 | 286.65 m2 | 13- Gypsum and cement plastering
15 | ... | - | 500 | 300.00 m2 | 14- Cement plastering for exterior faces with painting
4 | 256 | - | 120 | 363.20 m2 | 15- Distemper painting
181 | 200 | 8 | - | 22.65 m2 | 16- Steel windows with frames (deleted price of wooden frame, mesh, and slide)
40 | 450 | 5 | - | 8.09 m2 | 17- Wooden doors
335 | ... | 3 | - | 145.00 m2 | 18- Concrete ceilings
6 | 500 | 3 | - | 2.50 m2 | 19- Concrete frames around windows
3 | 600 | - | 800 | 4.50 m2 | 20- Parapet/Coping
47 | ... | - | 125 | 376 kg | 21- I-beams with bolts and plates
51 | 165 | 2 | 250 | 22.74 m.l | 22- Rainwater gutters
26 | 670 | 3 | 500 | 7.62 m.l | 23- Al-Muraidi stone

Archival unit 6

(C)
⟦Bill of Quantities and Prices for ... School⟧
Amount
Dinar | Fils | Price
Dinar | Fils | Quantity and Unit | Details
56 | 400 | | 150 | 376.00 m2 | Painting with emulsion J.C.J | 24
15 | 650 | | 250 | 62.60 m2 | Painting with oil paint - Enamel | 25
91 | 988 | 1 | 300 | 70.76 m2 | Tiling with mosaic tiles | 26
35 | 380 | | 500 | 70.76 m2 | Concrete under the tiles with moisture proofing | 27
20 | 878 | | 200 | 104.39 m2 | Square paving under the concrete | 28
27 | 290 | | 750 | 36.35 m3 | Polished concrete for walkways | 29
40 | 380 | | 750 | 53.84 m2 | Plain tiles for the roof | 30
14 | 100 | | 150 | 94.00 m | Jointing on the roof | 31
8 | 500 | 1 | ... | 6.50 l.m | Window sills | 32
58 | ... | 2 | ... | 29 points | Electricity | 33
12 | ... | 1 | 500 | 8 items | Counter Weight | 34
17 | 500 | | 250 | 70 yards | Main line cable 7/044 | 35
2221 | 181 | Total
111 | 059 | Deduct 5% according to the contractor's letter to His Excellency
 | | the Chairman of the Administrative Committee
2110 | 122 |
Only two thousand one hundred and ten dinars
and one hundred and twenty-two fils.
The Engineer
Saleh Yousef

Archival unit 7

⟦illegible⟧
⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦line⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
For the accountant
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧
⟦line⟧
⟦illegible⟧
⟦line⟧
⟦illegible⟧

Archival unit 8

Presidency of the Administrative Committee
Of the Jewish Community
In Baghdad
⟦line⟧
Number 30 / 35
Date 20 / 1 / 957
To the esteemed contractor Mr. Sassoon Shamoun
Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and yourselves,
You undertook to complete the work within a maximum period of two months, and as a result of the increase occurring in the construction which does not exceed 25% in any case,
The contract period shall not exceed 75 days, while more than 100 days have passed since the construction began according to the Community's letter dated 3 / 10 / 956
Numbered M / 395 / 56, which orders you to work. Since the Community has the right to deduct three Dinars daily from your security deposits according to Article
- 6 - of the General Conditions sheet, and you have no excuse in any case according to the same article which states (Any objection
submitted by the contractor for his delay in the work will be rejected). Your dispute with the Community's engineer does not justify your failure or delay according to the fifth article of the same
sheet, which states "-
The supervising engineer has the right to change the maps and quantities as he sees fit, and the contractor has no right to object to that,
and the surplus or deficit quantities are priced according to the contractor's price in the bill of quantities.
Therefore, the Administrative Committee warns you according to the sixth article of the second page of the General Conditions, which states
"The two contracting parties waive the serving of warnings from one to the other via the Notary Public regarding the affairs of this contract,
and every warning directed from one of the parties must either be delivered to the address of the other party or sent to it by registered mail."
The Administrative Committee warns you according to this article to begin work at a date no later than Tuesday, corresponding to 22 / 1 / 1957, and in
the event that you do not begin on the aforementioned date, the Community may be forced to exercise its right according to Article - 18 - and it will complete the work on
your account based on the provisions of that article.
If you do not begin work on the mentioned date, you are requested to attend on Tuesday of the same previous date in the evening to conduct the necessary
inventory according to what is stated in Article - 18 - and in case you or your representative do not attend, the Community will be forced to conduct the necessary inventory
according to what is stated in Clause C of Article - 18 - which states "-
If the contractor does not attend or does not send a representative to act on his behalf, the inventory shall be conducted in his absence. We inform you that the Community will stop paying
any amount to you until the work is completed according to what is stated in Article - 18 - and the text is (The Community may refrain from paying any amounts
due to him until these expenses and losses are settled). The Community prevents you from removing any materials, tools, or scaffolding belonging
to you in case you do not begin work on the mentioned date according to Article - 18 - of the General Conditions.
This warning does not prevent the Community from upholding its right to fine you according to what is stated in Article (6), just as its order to you
to start work is not considered an acknowledgment of the quality of the work that has been completed.
Please accept my highest respect.
President of the Administrative Committee
A copy to "-
The contractor's file in the Community
The Director of Frank Iny School
The Community's engineer

Archival unit 9

Presidency of the Administrative Committee
of the Jewish Community
Baghdad
Number 10 / .
Date = 20 / 1 / 957
The Respected Contractor Mr. Sasson Shamoun ⟦line⟧
Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and you,
you undertook to complete the work within a maximum period of two months, and as a result of the increase occurring in the construction, which in no case exceeds 25%
the duration of the contract shall not exceed 75 days, while more than 100 days have passed since the construction began, according to the Community's letter dated 3 / 10 / 956
numbered M / 395 / 56 which orders you to work. Since it is the right of the Community to deduct from your insurance three Dinars daily according to Article
- 6 - of the General Conditions Page, and you have no excuse in any case according to the same article which states (Any objection
submitted by the contractor for his delay in the work shall be rejected) and your disagreement with the Community's engineer does not justify your failure or delay according to the fifth article of the same
page, which states "-
The supervising engineer has the right to change the drawings and quantities as he sees fit, and the contractor has no right to object to that
and the surplus or deficient quantities are priced according to the contractor's price in the Bill of Quantities ⟦line⟧.
Therefore, the Administrative Committee warns you according to the sixth article of the second page of the General Conditions which states
The two contracting parties waive the serving of warnings from one to the other through a Notary Public in matters of this contract ⟦line⟧
and every warning addressed by one of the parties must either be delivered to the address of the other party or sent to him by registered mail.
The Administrative Committee warns you by virtue of this article to start the work at a date no later than Tuesday, corresponding to 22 / 1 / 1957, and in
the event of your failure to start on the mentioned date, the Community may be forced to exercise its right according to Article - 18 - and will itself complete the work on ⟦line⟧
your account based on the provisions of that article.
If you do not start work on the mentioned date, please attend on Tuesday evening of the same aforementioned date to conduct the necessary inventory
as stipulated in Article - 18 - and in the event of your absence or the absence of your representative, the Community will be forced to conduct the necessary inventory
as stipulated in Paragraph C of Article - 18 - which states "-
If the contractor does not attend or does not send a representative to ⟦act on his behalf⟧, the inventory shall be conducted in his absence. We inform you that the Community will stop paying
any amount to you until the completion of the work as stipulated in Article - 18 - and the purpose is (the Community may refrain from paying any sums ⟦line⟧
due to him until these expenses and losses are settled). The Community forbids you from removing any materials, tools, or scaffolding belonging ⟦line⟧
to you in the event of your failure to start work on the mentioned date according to Article - 18 - of the General Conditions.
This warning does not prevent the Community from upholding its right to fine you as stipulated in the contract (6), just as its order to you
to start work is not considered an admission of the quality of the work completed.
Please accept our utmost respect ⟦line⟧
Head of the Administrative Committee ⟦line⟧
Copy to "-
Contractor's file in the Community
Director of Frank Iny School
Community Engineer ⟦line⟧

Archival unit 10

Presidency of the Administrative Committee
of the Jewish Community
in Baghdad
Number :: ⟦19⟧
Date :: 20 / 1 / 1957
The Respected Contractor, Mr. Sasson Shamoun,
Pursuant to the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and you,
you undertook to complete the work within a maximum period of two months. As a result of the increase in construction, which does not in any case exceed 25%,
the duration of the contract should not exceed 75 days, whereas construction has been ongoing for more than 100 days according to the Community's letter dated 10 / 3 / 1956
and numbered M / 365 / 56 which orders you to work. Since the Community has the right to deduct three Dinars daily from your insurance according to Article
- 6 - of the General Conditions sheet, and you have no excuse in any case according to the same article which states (and any objection
submitted by the contractor for his delay in work will be rejected), and your disagreement with the Community engineer does not justify your failure or delay according to the fifth article of the same
sheet which states: -
The supervising engineer has the right to modify maps and quantities as he deems appropriate, and the contractor has no right to object to that,
and the excess or deficient quantities are priced according to the contractor's price in the bill of quantities.
Therefore, the Administrative Committee warns you according to Article Six of the second page of the General Conditions which states:
The two contracting parties waive the serving of warnings from one to the other through the notary public in the affairs of this contract,
and every warning addressed by one of the parties must either be delivered to the other party's address or sent to them by registered mail.
The Administrative Committee warns you under this article to start work on a date no later than Tuesday, 22 / 1 / 1957. In
the event that you do not start on the aforementioned date, the Community may be forced to exercise its right according to Article - 18 - and complete the work on
your account based on the provisions of that article.
If you do not start work on the aforementioned date, please attend on Tuesday of the same previous date in the evening to conduct the necessary inventory
according to Article - 18 -. In the event of your absence or the absence of whoever represents you, the Community will be forced to conduct the necessary inventory
according to Clause C of Article - 18 - which states: -
If the contractor does not attend or does not send a representative on his behalf, the inventory shall be conducted in his absence. We inform you that the Community will stop paying
any amount to you until the completion of the work according to Article - 18 - which is (the Community may refrain from paying any amounts
due to him until these expenses and losses are settled). The Community prevents you from removing any materials, tools, or machinery belonging
to you in the event that you do not start work on the aforementioned date according to Article - 18 - of the General Conditions.
This warning does not prevent the Community from upholding its right to fine you according to what the contract states (6), and its order to you
to start work is not considered an acknowledgment of the quality of the work that has been completed.
Please accept our highest respects.
President of the Administrative Committee
A copy to: -
The contractor's file in the Community
The Director of Frank Iny School
The Community Engineer

Archival unit 11

Presidency of the Administrative Committee
of the Jewish Community
Baghdad
⟦line⟧
Number: 19 / 1
Date: 20 / 1 / 1957
Honorable Contractor, Mr. Sassoon Shamoun,
Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and you,
you undertook to complete the work within a maximum period of two months. As a result of the increase in construction which does not exceed 25% in any case,
the contract period shall not exceed 75 days, whereas more than 100 days have passed since construction began according to the community’s letter dated 3 / 10 / 956
numbered M / 365 / 56, which orders you to work. Since it is the community's right to deduct three Dinars per day from your securities according to Article
- 60 - of the General Conditions Page, and you have no excuse in any case according to the text of the article which states (and any objection
submitted by the contractor for his delay in work shall be rejected). Your dispute with the community's engineer does not justify your default or delay according to the fifth article of the same
page, which states:
The supervising engineer has the right to change maps and quantities as he deems appropriate, and the contractor has no right to object to that,
and surplus or deficient quantities shall be priced according to the contractor’s price in the bill of quantities.
Therefore, the Administrative Committee reminds you, according to Article Six of the second page of the General Conditions, which states:
The two contracting parties waive the serving of warnings from one to the other through a notary public regarding the affairs of this contract,
and every warning directed from one of the parties must either be delivered to the address of the other party or sent to it by registered mail.
The Administrative Committee warns you, according to this article, to start work at the latest on Tuesday, corresponding to 22 / 1 / 1957, and in
the event that you do not start on the mentioned date, the community may be forced to exercise its right according to Article - 18 - and complete the work itself on
your account based on the provisions of that article.
If you do not start work on the mentioned date, please attend on Tuesday of the same previous date in the evening to conduct the necessary inventory
as stipulated in Article - 18 -. In the event of your absence or the absence of whoever represents you, the community will be forced to conduct the necessary inventory
as stipulated in Clause C of Article - 18 -, which states:
If the contractor does not attend or does not send a representative to act on his behalf, the inventory shall be conducted in his absence. We inform you that the community will stop paying
any amount to you until the completion of the work as stipulated in Article - 18 -, which is (the community may refrain from paying any amounts
due to him until these expenses and losses are settled). The community prohibits you from removing any materials, tools, or scaffolding belonging
to you in the event that you do not start work on the mentioned date according to Article - 18 - of the General Conditions.
This warning does not prevent the community from adhering to its right to fine you as stipulated in the contract (6), nor does its order to you
to start work constitute an admission of the quality of the work that has been completed.
Please accept the highest respects.
President of the Administrative Committee
Copy to:
Contractor's file in the community
Director of Frank Iny School
Community Engineer

Archival unit 12

Presidency of the Administrative Committee
of the Jewish Community
Baghdad
⟦line⟧
Number ⟦illegible⟧ / 1
Date 20 / 1 / 1957
To the Respected Contractor Mr. Sasson Shohet
Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and yourselves,
you undertook to complete the work within a maximum period of two months. As a result of the increase in construction, which does not exceed 25% in any case,
the contract period shall not exceed 75 days, whereas over 100 days have passed since construction began according to the community’s letter dated 3/10/1956
numbered M/56/315, which orders you to work. Since the community has the right to deduct three Dinars daily from your insurance according to Article
- 60 - of the general terms sheet, and you have no excuse in any case according to the text of the article which states (and no objection
submitted by the contractor for his delay in work will be read), and your dispute with the community's engineer does not justify your procrastination or delay according to the fifth article of the same
sheet, which states:
The supervising engineer has the right to modify the plans and quantities as he deems appropriate, and the contractor has no right to object to that,
and the increased or decreased quantities shall be priced according to the contractor’s price in the undertaking schedule.
Therefore, the Administrative Committee warns you according to the sixth article of the second page of the general terms, which states:
The two contracting parties exchange warnings from one to the other through the notary public regarding the affairs of this contract,
and every warning addressed by one of the parties must either be delivered to the address of the other party or sent to it by registered mail.
The Administrative Committee warns you under this article to start work by no later than Tuesday, 22/1/1957. In
the event that you do not start on the aforementioned date, the community may be forced to exercise its right according to Article - 18 -, which is to complete the work at
your expense based on the provisions of that article.
If you do not start work on the aforementioned date, please attend on Tuesday of the same previous date in the evening to perform the necessary inventory
according to Article - 18 -. In the event of your absence or the absence of your representative, the community will be forced to perform the necessary inventory
according to Clause C of Article - 18 - which states:
If the contractor does not attend or does not send a representative ⟦illegible⟧ on his behalf, the inventory shall be conducted in his absence. We inform you that the community will stop paying
any amount to you until the completion of the work according to Article - 18 -, and the text is (the community may refrain from paying any amounts
due to him until these expenses and losses are settled). The community prohibits you from removing any materials, tools, or scaffolding belonging
to you in the event you do not start work on the aforementioned date according to Article - 18 - of the general terms.
This warning does not prevent the community from upholding its right to fine you as stipulated in the contract (6), nor does its order to you
to start work constitute an admission of the quality of the work completed.
Please accept our highest respects.
President of the Administrative Committee
Copy to:
Contractor's file at the community
Director of Frank Iny School
Community Engineer

Archival unit 13

2
⟦illegible⟧ what is stipulated in ⟦illegible⟧
Article (18) which states
"If the contractor does not execute or does not send a representative ⟦illegible⟧"
And accordingly ⟦illegible⟧ the community will act in paying ⟦illegible⟧ to you ⟦illegible⟧
The work ⟦illegible⟧ Article 18 and it is not
(The community must refrain from paying any amounts that may be due to him from
⟦illegible⟧ these expenses and profits)
The community ⟦illegible⟧ in ⟦illegible⟧ or ⟦illegible⟧ all your relationship in
case of non-⟦illegible⟧ mentioned according to Article 18 of the General
Conditions
This warning does not prevent the community from upholding its rights by your submission of a share
what the contract stipulates ⟦illegible⟧ except that its order to you to work is not considered ⟦illegible⟧ in possession of the work which
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧

Archival unit 14

⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧ ⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
⟦illegible⟧

Archival unit 15

FRANK INY SCHOOL
Intermediate & Primary
New Alwiyah - Baghdad
TELEPHONE No. 91693
Frank Iny School
Intermediate and Primary
New Alwiyah - Baghdad
Telephone: 91693
No.:
Date:
No.: F / 60 / 57
Date: 10 / 2 / 1957
Presidency of the Administrative Committee of the Jewish Community in Baghdad
Subject: Settlement of the new building account at the school
Greetings,
With reference to the letter from Mr. Saleh Yousef, the engineer, dated 7 / 2 / 1957, addressed to
your respected committee and a copy to us, please be informed of the following:
1- The roof of the water jar room (Al-Habbab), which was damaged by the contractor's workers during their work
on the new building, has not yet been completed, noting that this causes the drinking water jars to be constantly
contaminated with dust and rainwater.
2- The locks of the five doors have not yet been changed as stipulated in the contract according to what was mentioned by Mr. Saleh
Yousef.
3- There are still some paintings on the building's windows that have not been completed yet.
4- It is necessary to complete the painting of the walls permanently from the outside and inside and to repair some spots on the internal
walls after completing the painting on the windows of the rooms.
5- It is necessary to replace one of the doors as it is smaller than the door opening by about half a foot.
6- There is a section of the roof directly above the toilet that remains without leveling and without
an outlet for water drainage, which harms the walls of the new room.
Furthermore, although these deficiencies do not cost much to complete, they prevent us from
using the new rooms that we are in dire need of at the present time. Therefore, please request
the contractor to complete them before settling his remaining debts as soon as possible.
Please accept our highest respect.
Abdullah Obeid
Director
Copy to: Mr. Saleh Yousef, the engineer - for information

Archival unit 16

Frank Iny School
In the Mixed Bataween
Telephone - In New Baghdad
Telephone Number: 93313
Number 75 / 102
Date 8 / 6 / 1958
FRANK INY SCHOOL
Intermediate & Primary
New Alwiyah - Baghdad
TELEPHONE NO. 93313
Report of the investigation committee on the incident that occurred at
the school's annual party on: ⟦illegible⟧
At 7:30 PM on Thursday, corresponding to 5 / 6 / 1958, while
the party was continuing to present its artistic program, the following occurred:
1 - While one of the female students was delivering a speech in English, a commotion occurred in the
rear side of the area designated for invitees due to a dispute between one of the guards and a person
who tried to enter without an invitation card, and the guards were able to remove him.
2 - After a period not exceeding five minutes, the commotion was repeated in the same place again,
so we, the members of the committee, rushed to the scene of the incident and it became clear to us that the mentioned guard had suffered a wound to his head.
3 - We immediately requested an ambulance for the injured person and transferred him to the hospital, and we also informed
the police station of the incident, and the station officer arrived and conducted the necessary investigation at the time.
4 - It appeared from the investigation that the person who caused the commotion is the one named ( ⟦illegible⟧ )
from the residents of the Bataween area, and he was arrested by the police.
5 - The party continued presenting its segments as usual, and this incident did not affect the progress of the program,
and the party ended at eleven o'clock in the evening.
This is what was necessary to state.
Signatures:
1 - ⟦signature⟧
2 - ⟦signature⟧
3 - ⟦signature⟧
Note: A copy of it to the Baghdad Education Directorate

Archival unit 17

Administrative Committee of the Jewish Community
in Baghdad
Telephone Number 5452
⟦line⟧
Number: 56/395/M
Date: ⟦1956/10/6⟧
Subject Summary: ⟦line⟧
To:-
The Contractor, Mr. Sassoon Shamoon, Respectfully
Greetings,
Based on your letter dated 1956/10/3 in which you state your readiness
to discount 5% from the prices you submitted to the Community Leadership, we inform you that the Community
has accepted your offer. Therefore, you must begin work within a maximum period of four days
from the date of this letter, based on the terms of the contract. And you are to sign the contract form
as soon as possible.
⟦signature⟧
Chairman of the Administrative Committee
Copy to:-
Engineer of the Community Leadership - For information

Archival unit 18

His Excellency the Chairman of the Administrative Committee, respected
Greetings and respect,
Further to the prices I submitted on September 20, 1956, I am prepared
to reduce the prices by 5% under the same conditions mentioned in
the contract documents, out of my desire to serve the community.
The Engineer
Salman Cohen
⟦signature⟧
October 2, 1956
⟦illegible⟧

Archival unit 19

Secret tender for the construction of a classroom and a storehouse in Frank Iny School
Contract Form
This contract was concluded between the Presidency of the Jewish Community (hereinafter known as the Community)
And between ⟦Yaqub Cohen⟧
Known hereinafter as the Contractor, who for the purpose of this contract has taken an office in ⟦Building⟧
⟦Al-Daftarji, second floor, apartment No. 88⟧. At this address, registered letters sent to him
or warnings, orders, and instructions delivered to him by hand are considered valid delivery and notification.
The engineer or engineers ⟦—⟧ the engineer who executes this contract on behalf of the Community
is the Community's engineer or any other engineer or engineers appointed by the Community in writing in this capacity, and the
Contractor shall be notified of their names for the execution of the work stipulated in this contract. The Contractor has also agreed hereby
to provide - in accordance with the terms and conditions contained herein and in the specifications, price schedule, and maps -
the construction materials stipulated in the general conditions and all workers, machinery, equipment, tools, and instruments,
scaffolding, guards, and everything that is necessary or may be necessary for the works and services covered by this
contract and to complete them fully with the highest degree of perfection and craftsmanship in the execution of the "construction of a classroom and a storehouse" in
Frank Iny School in Baghdad.
The Contractor acknowledged that he has visited the work site and has reviewed in full, accurately and precisely, all
the maps and the work to be performed under this contract, as he has also reviewed the work
site and the location for storing construction materials and water installations.
The Contractor agrees to carry out the construction of the classroom and the storehouse according to the relevant issued maps and those which
the supervising engineer may issue in the future, the schedule of works and prices, general conditions, and technical
specifications in full in all respects, for a total lump sum amount of ⟦1436.925⟧ Dinars (in writing)
⟦Only one thousand four hundred and thirty-six Dinars and nine hundred and twenty-five Fils, nothing else⟧
The Contractor also undertakes to complete this work within a period of ⟦120⟧ days starting from
(4) days after the date of the Community's letter requesting him to commence work.
Signature /
Head of the Administrative Committee of the Presidency of the Jewish Community
in Baghdad.
Witness ⟦line⟧ Date ⟦line⟧
Witness ⟦line⟧
Signature / ⟦signature⟧
The Contractor, Mr. ⟦Yaqub Cohen⟧
Date ⟦20 / 9 / 1956⟧
Dinar
Dinar

Archival unit 20

Secret tender for the construction of a classroom and a warehouse for the Frank Iny School in Baghdad
General Conditions
1- The bidder must submit cash security in the amount of -/30 Dinars, and this security may be submitted in the form of
a letter of guarantee from a bank to the Presidency of the Jewish Community in Baghdad.
2- The bidder must submit the contract documents in a sealed envelope at or before 12:00 PM on
corresponding to 20/9/1956 to the Presidency of the Jewish Community in Baghdad, provided that it is written on the envelope
(Secret tender for the construction of a classroom and a warehouse for the Frank Iny School in Baghdad).
3- The Community reserves the right not to accept the lowest-priced tenders and has the right to reject any tender without giving
reasons for doing so.
4- Any tender not submitted at the time specified in paragraph (2) above or not accompanied by the specified security
will be subject to neglect.
5- The supervising engineer has the right to change the drawings and quantities as he deems appropriate, and the contractor has no right
to object to that, and the excess and deficient quantities shall be priced according to the contractor's price in the bill of quantities.
6- If the contractor delays in completing the work within the period specified by him, he must pay three Dinars
(3 Dinars) daily to the Jewish Community in Baghdad, and any objection submitted by the contractor regarding
the delay in work will be rejected, and these compensations will be deducted from his entitlements or security deposit.
7- When the quality of any material present in the bill of quantities is not mentioned, the supervising engineer alone will be responsible
for choosing it as he deems appropriate, and the contractor has absolutely no right to object to that.
8- The contractor must specify the period he needs to complete the work, and this period will be taken into consideration
when studying the tender.
9- Bidders must sign all the drawings attached to this tender as well as all pages of the tender
and return them within their bid.
10- Materials
The contractor must provide all materials necessary for the work and fixed in the drawings and the price schedule, and
the contractor alone is responsible for all materials and tools at the work site and is responsible for every
theft or deficiency that occurs therein, noting that all materials at the work site are considered property of the Jewish
Community until the completion of the work, and the contractor has no right to remove or dispose of them except with the
written approval of the Jewish Community.
11- Dismissal of the contractor's employees
The engineer has full authority to request that the contractor dismiss or exclude any of his employees whom the
Community deems undesirable or unsuitable for continuing in the work, and the contractor must implement those requests immediately
upon their issuance, and he has no right to claim any compensation or indemnity that may result from that in any form whatsoever.
12- Advances
The Community pays cash advances at the end of each month for completed works and materials supplied at the site
of work after obtaining a certificate from the engineer to that effect, on the basis of 90 percent of the cost
of completed works according to contract prices and 75 percent of the value of construction materials supplied at
,, Continued ,,

Archival unit 21

Page 2
the work site according to its local estimation. Provided that these advances granted to
the contractor are not considered an admission of acceptance of the work by the Community; rather, the terms of the contract apply to all
completed and uncompleted work until it is finally handed over to the Community.
13 – Final Measurement and Settlement of the Contractor’s Account
After the work is fully completed in all respects as certified by the Community's engineer, the Jewish Community
shall take provisional delivery of the work, and the contractor’s account shall be settled according to the agreed-upon lump sum amount
in this contract, after deducting all advances paid to the contractor on account of his work. As for
the contractor’s security deposits, the Community shall retain them for the maintenance period and return them to him upon its conclusion and after the
final handover of the work.
14 – Rejection of Work
The engineer has the right to reject any materials supplied by the contractor or any work which, in the engineer's view, is based on
quality and workmanship that do not meet the required standard or are not compliant with the relevant specifications or drawings
of the contract. The contractor must remove the rejected materials and work and re-execute them at his own expense,
including the materials present in the rejected work.
Any work carried out without authorization in addition to the details given in the drawings or
issued instructions will not be recognized, measured, or paid to the contractor for the value of the materials
used in the execution of such works.
15 – Maintenance Period
The contractor shall maintain the work for a period of three months from the date the Community takes delivery of the work from him
provisionally. He must repair all deficiencies or defects that may appear during the maintenance period
at his own expense. The security deposits or what remains of them shall be returned to him after deducting the amounts due
from him properly at the end of the maintenance period and after the contractor has fulfilled his obligations and the
final handover of work from him has been completed.
The contractor must carry out the repairs requested by the Community within one week from the date
of written notification. If he fails to perform the work, the Community shall withdraw the security deposits belonging
to him if they are in the form of a bank guarantee, and carry out the work at his expense and deduct the amount from him.
16 – Notices
The two contracting parties waive the right to direct notices from one to the other through
the Notary Public regarding the matters of this contract. Every notice directed from one party should
either be delivered to the address of the other party or sent to them by registered mail.
17 – Labor Laws
The contractor is responsible for applying the Labor Law regarding all labor matters and observing it
concerning wages for official holidays, feasts, and compensation. He is also responsible for accidents that
occur to his employees at the work site and must pay all compensation resulting therefrom,
as the Community is not responsible at all regarding the laborers.
,, Continued ,,

Archival unit 22

Page 3
18 – Withdrawal of Work from the Contractor and its Consequences
⟦line⟧
A – If the contractor fails to start the work promptly upon receiving written notice to do so.
B – Or if he falls short in performing the execution of works with the required speed.
C – Or if he fails to perform the execution of works in accordance with the contract.
D – Or if he delays in completing the works beyond the deadline specified in the contract.
E – Or if he actually stops work for a period of fourteen days without written permission from the Community, unless
he proves the existence of force majeure and immediately informs the Engineer and the Community in writing.
F – Or if he fails to supply or install machinery, labor, materials, and equipment that are sufficient and appropriate so that
the permanent work can be executed quickly and without interruption.
G – Or if he commits, personally or through an intermediary, any violation of any provision or provisions of the contract he is bound
to execute or observe, and continues in this violation for a period of 14 days (taking into account any special condition
stipulating a shorter period) after being warned in writing by the Engineer to rectify this violation.
H – Or if he abandons the work entirely.
I – Or if the contractor becomes (whether in Iraq or abroad) bankrupt, or if he files
an application for bankruptcy, or if his financial insolvency is proven, or if he reaches a settlement with his creditors, or if the contractor is a company and it
has been liquidated, whether the liquidation was compulsory or voluntary (unless the voluntary liquidation is intended
for the re-formation of the company on a basis approved in writing by the government), or if the contractor is a company
and it was dissolved, or if the contractor gives, promises, or offers a gift, advance, reward, or benefit
of any kind to any employee or worker among the Community's employees, whether he is independent or has any
relation to the work subject of this contract, then the Community may, in any of these cases:ـ
1 – Withdraw from the contractor the execution of the remaining works.
2 – The withdrawal of the execution of the remaining works shall be according to what was previously mentioned by sending a written warning
by order of the President of the Administrative Committee of the Israelite Community to the contractor, and this
warning shall be valid and effective without taking any legal or official procedures.
3 – If the contractor is granted any extension or leniency, this does not reduce or prejudice the rights of the
Community under this article, and the preceding provisions do not affect the Community's right to
claim the compensations established under the laws in force.
4 – In the event of withdrawing the work or part of it from the contractor according to what was previously explained or
according to any other provisions contained in the contract, the Community may, at its discretion regarding cost,
exercise one of the following rights:ـ
A – To perform itself, at the contractor's expense, the execution of all the works that have not been completed
yet, or any part thereof.
B – To put all or some of the works that have not been completed yet out for tender again.
,, Continued ,,

Archival unit 23

⟦40⟧
Page 4
C - To agree with one of the contractors privately to complete the work.
In all these cases, the Sect shall have the right to seize all or some of the machinery,
tools, and materials brought by the contractor and to use them to complete the work
without being responsible to the contractor or others for these machines, tools,
and materials, nor for any damage or decrease in value that may occur to them for any reason, and without being
responsible also for paying any amount due for them to another party or paying any fee for them
to the contractor or others. The Sect shall have the right in any case to seize all or some of
the machinery, tools, and materials even after the completion of the work as a guarantee for its rights.
The contractor must pay the Sect all the expenses it incurs in this regard
in excess of the contract value, and he must compensate it for all the losses it incurs because of
that. The Sect may deduct the value of the expenses and losses referred to from the amount
of insurance or from the contractor's claims or from any money belonging to him; however, if the work costs
less than the contract prices, the difference shall not be returned to the contractor.
For this purpose, the Sect may refrain from paying any amounts that have been granted
to him until these expenses and losses are settled, and the Sect may sell the machinery, tools,
or materials brought by the contractor without being responsible for any loss
incurred by him as a result of their sale.
In the event of withdrawing the work from the contractor, an inventory list shall be organized for the works, buildings,
tools, equipment, and materials located at the work site, and for the work that has been completed in a satisfactory
condition, by the knowledge of the responsible Sect engineer. This inventory shall be conducted in the presence of
the contractor, who must be officially notified to attend, he or his representative. If the contractor does not attend
or does not send a representative on his behalf, the inventory shall be conducted in his absence.
This inventory shall be confirmed by a report signed by the Sect engineer
and the contractor or his representative. If any dispute or conflict arises regarding the state of the existing
work, this dispute or conflict and its nature must be recorded in the aforementioned report.

Archival unit 24

Schedule of Works and Prices
For the contract of constructing a classroom (ground floor) and a store (second floor above an existing building)
Details of Works | Quantity and Unit | Price | Amount
1 - Planning the room's ground with preparing the roof of the existing building to build another floor above it. | Lump sum | ⟦line⟧ | 20,000
2 - Earth excavations for foundations | 38.00 m3 | 0.250 | 9.500
Excavations shall be according to the maps and shall be vertical, edges and sides straight, and the bottom of the excavation level and balanced. The resulting soil from the excavation shall be removed outside the construction site, and if the contractor exceeds the works indicated in the plan without the engineer's - written - approval, he must fill the excess excavations with concrete (1-3-6) at his own expense.
3 - Paving works with broken bricks | 54.00 m2 | 0.200 | 10.800
The broken bricks shall be of the hard-fired type with a thickness of 12 cm. The price includes the process of pounding with iron rammers well, spraying with water, and grouting with cement mortar in a ratio of (1 - 5).
4 - Unreinforced concrete works for foundations | 7.75 m3 | 4.700 | 12.925
The concrete ratio shall be (1-3-6) of cement, Habbaniyah sand, and washed river gravel of graded size (1 inch and below). The sand must be from Habbaniyah Lake sources, and river sand may not be used at all for any construction purpose except with the engineer's approval.
5 - Building with bricks and cement. | 6.000 m3 | 4.000 | 24.000
The bricks shall be of the fired type, and construction shall be carried out with cement mortar and Habbaniyah sand in a ratio of (1-5) from the start of the concrete pouring for foundations up to five courses above the damp-proof course (DPC). It is not permissible to use broken or used bricks. The fired bricks shall be submerged in water before construction for a sufficient period of not less than six hours. All vertical and horizontal joints shall be filled with cement mortar, and the process of spraying the walls with water shall continue for a period of not less than seven days. The price includes all of the above in a professional and good manner (and the sect's engineer has the right to reject any part of the construction that he does not see as conforming to technical conditions or because it contains salts).
6 - Damp-proof concrete with Silocrete 3" thick for walls | 8.00 m.l | 1.000 | 6.200
The mixing ratio shall be (1 - 2 - 4) of cement, Habbaniyah sand, and washed river gravel of graded size from 3/4" and below. The Silocrete ratio shall be (1 - 5) of the amount of water required to make the concrete. The price includes the necessary wooden formwork.
" To be continued "
85.425

Archival unit 25

Page 2
⟦line⟧
Amount | Price | Quantity and Unit | Details of Works
25,700
28.150 | 0.100 | 257 m2 | 7- Pouring concrete under the tiles with a thickness of 7 cm.
The concrete shall be in a ratio of 1-3-6 cement with Habbaniya sand
and washed river gravel, and the concrete shall be mixed
with Sealocrete as stated in paragraph (6).
2.100 | 0.050 | 42 L.m | 8- Damp-proof plaster with Sealocrete with 1" thickness for walls
The mixing ratio shall be 1-3 of cement and Habbaniya sand
and the Sealocrete ratio shall be 1-8 of the amount of water required
for the mix. This damp-proof level is located at a height of
five courses above the first concrete damp-proof course
and the masonry between the first and second damp-proof courses shall be
cement masonry in a 1-5 ratio.
188.100 | 4.000 | 47 m3 | 9- Construction with perforated bricks and gypsum.
The bricks shall be of the white perforated type produced by
the Building Materials Company, and the gypsum must be hot
produced by mechanical factories. If it becomes clear
to the supervising engineer on behalf of the Community that a part of
the gypsum has been damaged as a result of that, the contractor must remove it
from the work site and not use it for any construction
purposes.
00.800 | 0.400 | 2 m3 | 10- Backfilling works for floors with soil
Backfilling operations are carried out in layers whose thickness does not exceed 20
cm, well-rammed with iron rammers and sufficiently saturated with water
to ensure no settlement of the floors, provided that the soil is
clean and free of stones, and the measurement shall be net
therefore, the contractor must calculate the shrinkage ratio after ramming.
80.000 | 20.000 | 4 m3 | 11- Reinforced concrete works
The mixing ratio shall be 1-2-4 of cement and Habbaniya sand
and washed river gravel of graded size from
3/4" and below, and the reinforcement bars shall be according to
the measurements and dimensions in the relevant maps, and the price includes
the necessary wooden formwork.
45,200
⟦line⟧
420.805 | 0.400 | 113 m2 | 12- Bitumen coating, felting, and mud leveling for roofs
a) First, a layer of bitumen no less than
3/8" thick is placed directly on the roof, extending over the parapet walls
to a height of 8 inches, provided that the bitumen is of the best quality
"To be followed"