Page 53
p. 23
22
2026/025
Paragraph | Work Details | Quantity | Price | Amount (Fils Dinar)
40 | Spiral doors for shops | 2,105/0 m2 | 2,900 | 252/-
41 | Reinforced concrete for column bases underground with formwork, mixing ratio 1-2-4 | 3,20/0 m3 | 11/- | 220/-
42 | Reinforced concrete with formwork <del>⟦illegible⟧</del> ⟦for screens⟧ to ground level at a ratio of 1-2-4 | 3,65/0 m3 | 21 | 1265/-
43 | Casting of polished concrete 15cm thick, ratio 1-2-4 | 2,1/0 m2 | ⟦0/900⟧ | ⟦18/000⟧
44 | Polished concrete steps for the stairs, ratio 1-2-4 | ⟦2/0⟧ m.p | ⟦2/500⟧ | ⟦5/000⟧
45 | Encasing sewage pipes in concrete, ratio 1-2-4 | 5/0 m.p | -/200 | 9/-
46 | Cement slurry under gypsum plaster, ratio 1-1 | 2,500/0 m2 | -/070 | 295/-
47 | Ironed cement pointing | 2,220/0 m2 | -/100 | 222/-
48 | Brickwork and cement 1-4 | 3,1/0 m3 | 4,600 | 4,650
49 | Glass brick construction for walls ⟦for the...⟧ | 500/0 ft2 | 1/750 | 87/500
50 | Serbus as per maps | 1,35/0 m2 | 4,450 | 78/750
51 | Cement rendering for skirtings | 2,500/0 m2 | -/250 | 87/500
52 | Electrical installations including boards, main switch, fuses.. etc | Lumpsum | 25/- | 25/-
53 | Ground leveling, servicing existing building, and moving all debris after the committee takes what it wants from said debris | Lumpsum | 15/- | 15/-
54 | Guarding, water supply, paying expenses, and supplying electricity if needed, and paying all expenses | Lumpsum | 15/- | 15/-
55 | Cleaning the building, wiping the glass, and making it complete in all aspects | Lumpsum | 5/- | 5/-
56 | Pipes for fresh water and sewage including elbows, traps, tees, and everything needed for the work | ⟦?⟧ | |
6 - | Nylon pipes 2 inch diameter for sink water | 15 m.p | 4,400 | 22,750
Page 55
p ( 22 )
Carried over from the previous page
Fils | Dinar
⟦line⟧
% to be deducted from all prices (if the bidder so desires)
Add 5% as a reserve amount that may or may not be spent
by order of the Administrative Committee ( Contingoncies ) .
Grand Total