AI English Translation, Pages 101-125
Page 14
Paragraph Details of Works Quantity and Unit Price Amount
3" x 3" x 1/4" to be fixed in the walls in a
good manner, and the leaves are of angle iron 2" x 2" x
1/4" and iron plate from the outside with a thickness of 1/8"
provided that the doors are equipped with foreign locks and
handles. The doors shall be plated on both sides.
Unless the doors are made of iron and glass, and in
that case, the glass division shall be according to the maps or
the instructions provided by the specialized engineer.
Wooden Doors 17
(p. 18)
Item | Details of the Wor⟦line⟧ks | Quantity and Unit | Price | Amount
| | | | Fils Dinar
28 Sanitary Installations
⟦line⟧
A - Porcelain Western Toilet. -
⟦line⟧
It must be of the best types -
available in the markets equipped with a
low water tank ⟦or⟧ that it operates by
a lever without a chain. And it must be
the siphon of the type approved by
the engineer. And the cover must be of
plastic type and it is not allowed to use a
wooden cover at all. And when installing the toilet
the drain pipe must be connected with a diameter of
(4) inches to the manhole or the septic
tank as required by necessity with
the installation of a vent pipe of 3 inches diameter
rising by 50 cm above the roof parapets
B - Porcelain Eastern Toilet
⟦line⟧
It must be of the best types -
available in the markets equipped with a
high water tank ⟦or⟧ that it operates by chain
as for the venting and connection to the manhole
or the septic tank, what was mentioned in
the previous paragraph must be observed.
C - Porcelain Washbasins
⟦line⟧
It must be of the best types -
available in the markets and of size
20 inches and it must be equipped with two faucets
of the plated type and a trap siphon
the faucets are connected to a lead pipe
p. 162
Item Details of Works Quantity and Unit Price Amount
Fils Dinar
⟦line⟧
Continuation of Item (28) Item - c -
⟦line⟧
and marked with a 1/2" diameter pipe, and a valve shall be placed
on each pipe in a suitable location. All
pipes shall be placed inside the walls or under
the tiles and encased in concrete in a
good manner.
d - Porcelain Urinals
Must be of one of the specified types
( 20 )
Item | Details of Works | Quantity and Unit | Price | Amount
⟦line⟧ ⟦line⟧ ⟦line⟧ ⟦line⟧ Fils Dinar
⟦line⟧ ⟦line⟧ ⟦line⟧ ⟦line⟧ ⟦line⟧ ⟦line⟧
Continuation of Item ( 28 ) - G -
⟦line⟧
G - From the inside 60 by 60 by 40 cm
And the manholes must be equipped with a cover of
cast iron of the (Air Tight) English type
Also, the floor of each manhole must be paved
with cement mortar and Habatiya sand to direct
and drain the foul water properly, provided
that the inner wall faces are plastered
with ⟦illegible⟧ mortar
and drain the foul water properly, provided
that the inner wall faces are plastered
with cement and sand mortar in a ratio of 1 - 3.
The contractor must supply and install these
sanitary tools and installations
provided they are of the best types
available in the markets and that he performs
the work according to the highest technical methods
The price includes all necessary
installations and fresh water pipes
and foul water pipes, and necessary elbows and studies
for the work and all fees resulting therefrom
The price includes all necessary
installations and fresh water pipes
and foul water pipes, and necessary elbows, studies,
tees, traps, valves, and vent
pipes of 3-inch diameter for the toilets
provided that the contractor takes into account
that his price also includes connecting
and extending fresh water pipes to the roof
and to the ground and first floors. K - 1
Includes extending foul water pipes -
(cast iron 4-inch diameter) to the foul
water tanks.
Note
⟦line⟧
The contractor has the right to place a lump sum
specifically for this item if he deems it appropriate to
make it independent from the previous items
p. (21)
Item | Work Details | Quantity & Unit | Price | Amount
| | | | Fils Dinar
29 | Reinforced concrete at a ratio of 1 - 2 = 4 for foundations according to the maps issued or to be issued by the specialized engineer. | | |
30 | Painting with Snowcem, three coats, in a very good manner. | | |
31 | Excavation and construction of a complete cesspit with a depth of no less than 3 meters and a bottom diameter of 3 meters, built with good bricks and clay. | | |
32 | Mosaic steps for the stairs (according to the design submitted by the specialized engine<del>er</del>) Precast. | | |
33 | Entrance door made of teak wood (according to the design submitted by the specialized engine<del>er</del>), with a frame size of 6" by 3". | | |
34 | Hooks for ceiling fans, and they must be of excellent type. | | |
35 | Jack arch roofing (Akada) with bricks and gypsum, provided that the gypsum is of the new hot type and the bricks are of excellent type. | | |
36 | Steel beams (I-beams) and alkaline, and it must be of English or Belgian type, new, blue in color, free of rust, and in the size required by necessity. | | |
37 | 4" size independent English gully with fixing and cover. | | |
38 | Partitions with bricks and cement, cement mix ratio 1 - 4. | | |
39 | Painting with distemper (Dry Distampar), and it must be of excellent type and not mixed with gypsum (plaster). | | |
p. ( 22 )
Carried over from the previous page ⟦line⟧ Fils Dinar
⟦line⟧ ⟦line⟧
% is deducted from all prices (if the bidder so desires)
5% is added as a reserve amount that may or may not be spent
by order of the Administrative Committee ( Contingoncies ) .
Grand Total
p. ( 8 )
Schedule of Works and Prices
For the construction contract of: Al-Musawi Cemetery Fence
On the land numbered:
District:
Item | Details of Works | Quantity and Unit | Price | Amount
Fils | Dinar
⟦line⟧
1 | Earth excavations for foundations
Excavations shall be according to what is stated in
the maps and shall be vertical and the edges
and sides straight and the bottom of the excavation level
and balanced. The soil resulting from the excavation shall be removed
outside the construction site, and if the contractor exceeds
the works indicated in the plan without the approval of
the engineer - in writing - he must backfill
the excess excavations with concrete
1 = 3 = 6 at his own expense.
2 | Paving works with broken bricks
The broken bricks shall be of the hard vitrified type
with a thickness of 12 cm. The price includes
the process of pounding with iron rammers
well, spraying with water, and grouting
with cement mortar in a ratio of 1 - 10.
3 | Unreinforced concrete works for foundations
The concrete ratio shall be 1 = 3 = 6 of
cement, Habbaniyah sand, and washed river gravel
rounded, size 1 1/2 inch
and below, and the sand must be from
Lake Habbaniyah sources, and it is not permitted to use
river sand at all for any purpose
of construction purposes except with the approval of the engineer.
Note: In all concrete works, a
mechanical mixer must be used.
- To be continued -
p ( 9 )
Item | Work Details | Quantity and Unit | Price | Amount
Item Work Details Quantity and Unit Price Amount
Fils Dinar
4 Construction with brick and cement
⟦line⟧
The bricks shall be of the hard-burnt type
and the construction shall be done with cement mortar and Habbaniya
sand in a ratio of 1:4. It is not permitted to use
broken or used bricks. The hard-burnt bricks
must be soaked in water before construction
for a sufficient period of no less than six hours, and all
vertical and horizontal joints must be filled
with cement mortar. The process of spraying the walls
with water shall continue for a period of no less than seven days.
The price includes everything mentioned above in a
masterful and good manner. (The Sect's engineer
has the right to reject any part of the construction
that he does not see as conforming to technical conditions
or due to it containing salts).
5 - Damp-proof course concrete with Sealocrete
with a thickness of 3 inches for the walls.
⟦line⟧
The mixing ratio shall be 1:2:4 of cement,
Habbaniya sand, and washed river gravel
graded in size from
3/4 and below. The ratio of
Sealocrete shall be 1:10 of the amount of water
required to make the concrete. The price includes
the necessary wooden formwork.
6 - Damp-proof plaster with Sealocrete
with a thickness of 1" for the walls.
⟦line⟧
The mixture ratio shall be 1:3 of cement
and Habbaniya sand, and the ratio of Sealocrete
shall be 1:8 of the amount of water required for the mixture
⟦...⟧
p ( 10 )
Item | Details of the Work | Quantity and Unit | Price | Amount
| | | | Fils Dinar
Follow-up to Item - 6 -
The level of this damp-proof course is located
at a height of five courses above the first concrete
damp-proof course, and the masonry between the first
and second damp-proof courses shall be cement masonry in a 1:4 ratio.
- 7 Pouring concrete under the tiles with a thickness of 5 cm.
The concrete shall be in a ratio of 1:3:6 cement
from Habbaniyah sand and river gravel,
and the concrete shall be mixed with Silocrete
as stated in Item ( 5 ).
- 8 Brick and gypsum masonry.
The bricks shall be of the white type
produced by the Construction Materials Company
or from any company selected by
the engineer, provided the bricks are
of the best types available in the
markets, and the gypsum must be freshly burnt
and produced by mechanical plants.
The engineer has the right to reject the gypsum
if he considers it is not of excellent quality,
likewise if it becomes clear to the supervising engineer
on behalf of the community that a part of the gypsum
has been damaged as a result of that, then
the contractor must remove it from the work site
and not use it for any purpose
of the construction purposes.
- 9 Earth filling works for floors.
Filling operations are carried out in layers whose thickness
does not exceed 20 cm. They must be well compacted.
- To be continued -
p ( 11 )
Item Details of Work | Quantity and Unit | Price | Amount
| | | Fils Dinar
Continuation of the ninth item
⟦line⟧
with iron rammers and saturated with water in a
sufficient manner to ensure no subsidence of the floors, provided that
the soil is clean and free of stones,
and the measurement shall be net, so the contractor must calculate
the shrinkage ratio after ramming.
10 - Reinforced concrete works for roofs, columns,
beams, stairs, balconies ... etc.
⟦line⟧
The mixing ratio shall be 1:2:4 of cement,
Habbaniya sand, and washed river gravel
graded in size from 3/4" and below,
and the reinforcing bars shall be according to
the measurements and dimensions in the relevant maps.
The price includes the necessary wooden formwork,
and the reinforced concrete must be sprayed for a period of no less
than ten continuous days, and the formwork
for vertical pours must not be opened before
48 hours have passed after pouring, and ten days
for horizontal pours. The strength and
durability of the formwork must be ensured, as the contractor is
the sole person responsible for that. If the
resulting pours are not in accordance with the maps
or engineering art and construction principles, the contractor
at that time shall be responsible for repairing them or
removing them and pouring them again as ⟦...⟧
necessity dictates.
11 - Bitumen and roofing works
a - First, a layer of bitumen is placed directly on the roof
with a thickness of no less than 3/8"
extending over the parapet walls to a height of
8 inches, provided that the bitumen is of
p. ( 12 )
Item | Work Details | Quantity and Unit | Price | Amount
| | | Fils | Dinar
⟦line⟧
Continuation of Item - 11 -
⟦line⟧
The best types of local bitumen, and an amount of
10 percent of liquid bitumen shall be added
during the heating of the bitumen. It is not permitted to use
black oil at all in the bitumen, noting that
the bitumen layers on the surfaces must overlap by 4 cm.
at least over each other.
B - Sloping the surfaces with fine soil whose
fineness matches Al-Habbaniyah sand, otherwise
the supervising engineer may reject it.
The sloping works are carried out by placing the soil
in layers not exceeding 5 cm. They are moistened
slightly with water and compacted with hand rammers, provided
that the average thickness of the slope is 10 cm.
in the middle and 15 cm. near the parapets.
C - Bitumen coating the surfaces again with a layer not less
than 3/8" in thickness, noting what was mentioned
in the item above.
12 - Rainwater Pipes
⟦line⟧
The pipes shall be made of cast iron with a diameter of 4
inches, and each pipe includes an elbow at the
roof and a base of cast iron or concrete
at the bottom. The elbow must be connected
by a small pipe piece to
the concrete basin on the roof, which
must have dimensions of 30 cm. by
30 cm. by 20 cm., provided that
the surface of the basin is at the level of the screed and the
concrete ratio is 1 - 2 - 4 with Sika material
as described with the damp proofing.
13 - Gypsum Plastering for Interior Walls
⟦line⟧
The joints between the bricks are first cleaned well,
then plastered with fermented gypsum
of excellent quality in a layer not less than 1/2
inch thick, provided that the gypsum is from the
Qanbar Ali mine or the Iraqi Building Materials
Company... first class... and the final
plaster surface must be polished and completely
level, and the corners regularly rounded.
Page 14
Paragraph | Details of Works | Quantity and Unit | Price | Amount
| " 3 " by " 3 " by 1/4 fixed in the walls well, and the shutters are angle iron " 2 " by " 2 " by 1/4 and iron plate from the outside thickness " 1/8 " provided that the doors are equipped with foreign locks and handles, and the doors shall be plated on both sides: unless the doors are made of iron and glass, in which case the glass division shall be according to the maps or instructions provided by the specialized engineer. | | |
17 | Wooden Doors | | |
| Frames shall be made of good Swedish pine wood free of knots and cracks and according to the dimensions and measurements in the relevant maps, provided that the frames are " 2 " by " 6 " and the shutters are " 2 " pressed on both sides with the best types of plywood, provided that the doors are equipped with hidden handles and locks with two keys of the best foreign types available in the local markets. | | |
18 | Tiling with mosaic tiles and cement mortar :- | | |
| 1 : 3 | | |
| Flooring materials shall be provided with the best types of mosaic tiles in size 8 inch by 8 inch (and if another size is requested, the difference shall be paid to the contractor) and tiled with mortar | | |
( p. 16 )
Item | Details of Works | Quantity and Unit | Price | Amount
| | | Fils | Dinar
⟦line⟧ | ⟦line⟧ | ⟦line⟧ | ⟦line⟧ | ⟦line⟧
Continuation of Item ( 21 )
⟦line⟧
( I. C. T. ) provided that the -
painting is done by brush. Windows
are calculated as one face.
22 Painting with Emulsion
⟦line⟧
Supply of Emulsion from ( I. C. T. )
company in colors selected by the
supervising engineer, then
performing the painting of walls after cleaning
and wiping them well, and painting with a brush in two coats.
The Community has the right to provide a special painter
if it deems it necessary and in case
of its supervising engineer's disapproval of
the quality of the paint and its method.
23 Electrical Installations
⟦line⟧
The contractor must carry out all required
electrical installations. Wires,
pipes, and other electrical installations
shall be of the G.E.C. type, and
the point shall be complete in all respects including
the lamp and the ceramic shade.
A - Hidden point with unsplit threaded
conduits.
B - Surface point
Note
⟦line⟧
- A two-way point is considered as one point
and a half, and considering the plug regardless of its type
as half a point.
p. ( 17 )
_
Item Details of Works Quantity and Unit Price Amount
Fils Dinar
_ _ __ _________ _________ _
24 Brick and gypsum construction for the parapet (Al-Tegh)
----------
See the brick construction specifications mentioned
in item ( 8 ).
25 Staircase railing
----
And it shall be established according to the best workmanship and quality
( p. 18 )
Item | Details of Works | Quantity and Unit | Price | Amount
Fils | Dinar
⟦line⟧
28 Sanitary Installations
⟦line⟧
A - Porcelain Western Toilet . -
⟦line⟧
It must be of the best types -
available in the markets, equipped with a tank
low water or that it operates by
hand lever and chain. And it must be
the siphon of the type approved by
the engineer. And the cover must be of
plastic type and it is not allowed to use a cover
wooden at all. And when installing the toilet
the drainage pipe must be connected with a diameter
( 4 ) inches to the manhole or septic
tank as required by necessity with
installing a vent pipe 3 inches diameter
rising by 50 cm above the roof parapets
B - Porcelain Eastern Toilet
⟦line⟧
It must be of the best types -
available in the markets, equipped with a tank
high water or that it operates by chain
As for the venting and connection to the manhole
or septic tank, it must be noted
what was mentioned in the previous paragraph.
C - Porcelain Sinks
⟦line⟧
It must be of the best types -
available in the markets and of size
20 inches and to be equipped with two faucets
of the plated type and a leakage siphon.
The faucets are connected with lead pipes
( 20 )
Item | Details of Works | Quantity and Unit | Price | Amount
⟦line⟧ | ⟦line⟧ | ⟦line⟧ | ⟦line⟧ | Fils Dinar
⟦line⟧ Continuation of Item ( 28 ) ⟦line⟧ G ⟦line⟧
G ⟦line⟧ From the inside 60 by 60 by 40 cm
And the manholes must be equipped with a cover of
cast iron of the (Air Tight) English type
As well as the floor of each manhole must be paved
with cement mortar and Habaniya sand to direct
and drain the foul water in a good manner, provided
that the faces of the walls from the inside are plastered
with cement and sand mortar in a ratio of 1 = 3.
The contractor must supply and install these ⟦line⟧
sanitary tools and installations
provided they are of the best types
available in the markets and that he performs ⟦line⟧
the work according to the highest technical methods
The price includes all that is required of
installations and fresh water pipes
and foul water, and the necessary elbows, studies,
tees, traps, valves, and vent pipes
3-inch diameter for the toilets
provided that the contractor takes into consideration
that his price also includes the connection
and laying of fresh water pipes to the roof
and to the ground and first floors. K ⟦line⟧ 1
Includes laying foul water pipes ⟦line⟧
(cast iron 4-inch diameter) to the foul
water tanks.
Note
⟦line⟧
The contractor has the right to place a lump sum
specifically for this item if he deems it appropriate to
make it independent from the previous items
p. ( 22 )
Carried forward from the previous page ⟦line⟧ Fils Dinar
⟦line⟧ ⟦line⟧
% discount from all prices (if the bidder so desires)
Add 5% contingency amount that may or may not be spent
by order of the Administrative Committee ( Contingoncies ) .
Grand Total
p. ( 7 )
necessary for that, but if the committee prepares the materials and the work, it shall be at the expense of
the contractor.
21 - If new items are introduced that are not mentioned in the contract, they shall be agreed upon by the committee
and its engineer on one hand and the contractor on the other hand. If they do not agree, they may appoint arbitrators who have
experience in that, provided that the disagreement over this does not give the contractor any right to delay the work.
22 - A - The bidder must be someone who has previously performed works similar to this building in terms of
type and quantity, and must submit a statement of the mentioned works, their locations, and the names of their owners.
B - Preference is given to the bidder who owns the technical equipment necessary to complete the work, such as mixers,
vibrators ( ⟦line⟧ ), necessary iron elevators, and others ⟦line⟧
provided that the area of the formwork that the bidder is able to place at one time is not less than 1200/- square meters.
The bidder must submit a detailed statement of the mentioned equipment.
C - If the bidder is a company, they must attach the company's internal regulations to the bid
with the tender.
23 - The contractor undertakes to use the vibrator ( ⟦line⟧ ) for concrete works.
24 - The bars used for reinforcement shall be of the blue iron type, and it is not permissible to use
rusted bars.
25 - The gravel shall be of the clean, washed river type.