Baghdad on 9 / 2 / 1952
142
Honorable Professor Alwan Mahmoud, the respected
After greetings
Based on the indication of His Excellency the President of the Council, we refer to you the letter of the Ministry
of Social Affairs numbered 714 and dated 4 / 2 / 1952 with the attached report
to state your opinion, and whether you are ready for the required action, in the report
at the stated price of four hundred and twenty Dinars.
Please accept our highest respect
⟦signature⟧
Head of the Community
Page 178
Baghdad on 9/3/1953
Administration of the Communal Council - Baghdad
Number 1072
Date 19/3/1953
File Number
144
His Excellency the Respectable President of the Communal Council
After greetings
Upon inspection of the Rachel Shahmoon School building, the following became clear :-
1 - That a square meter of reed with a thickness of 2 inches and wood dividers of 3/2 and a back board of 1/3 connected with nails costs a price of
700 fils and not 600 fils as stated in the inspection of the esteemed Ministry's engineer; so the difference is 100 fils per square meter and since
the required amount is 565/9 m2, the total difference is 56/900 Dinars.
2 - According to the request of the Director of Refugee Affairs, Mr. Abdul Latif, six additional doors of Jitco were made, each door costing four
Dinars, making the total 24/000 Dinars.
3 - Also per the request of the Director of Refugee Affairs, plastering at a height of one meter on the placed reeds costs ten Dinars.
Therefore, the difference in the inspection is 90/900 Dinars over the inspection submitted by the mentioned Ministry, and thus it is not possible to perform
the mentioned undertaking for less than 500/000 Dinars.
Please accept the highest respect
The Contractor
Al-Usta Alwan Mahmoud
Page 179
T / ⟦2954⟧ / 53
10 / 3 / 1953
Rachel Shahmoon School Building.
145
To "-
General Directorate of Social Services
Greetings,
With reference to your letter No. 712 dated 3/4/1953;
1 - We agree to lease the Rachel Shahmoon School building located in the Al-Tawrat neighborhood; to be occupied by refugees at the rate approved by
the committee formed for this purpose, amounting to (1000/000) dinars, one thousand dinars annually, under the following two conditions: -
a- Your esteemed General Directorate undertakes to carry out all necessary repairs and renovations it deems appropriate for the purpose of occupying the mentioned building
by the refugees; for the duration of the contract at its own expense; without charging this Presidency any amount whatsoever.
b- The Presidency of the Community shall deliver the mentioned building; complete; in terms of electrical and water installations, window glass; and cleaning.
2 - As for our construction of the partitions according to the inspection report attached to your above-mentioned letter; at the estimated cost provided by you, amounting to
420/000 dinars; please note the following: -
a- We prefer that these partitions be carried out by your esteemed General Directorate directly.
b- In case that is not possible; the amount estimated for this purpose, which is (420/000) dinars, is insufficient; considering the report of the contractor
Alwan Mahmoud; assigned by the Presidency of the Community to carry that out. As the aforementioned person requested five hundred dinars to complete the required partitions
and he justified the difference between your estimate; and his estimate; by a difference in the price of papyrus (reeds) by 100 fils per square meter and additional works; not mentioned in
the inspection report attached to your above-mentioned letter; and requested by the Director of Refugee Affairs.
We attach herewith a copy of the mentioned contractor's report for your kind review.
In case of your approval to have the partitions and other works carried out by the contractor Alwan Mahmoud for the amount of five hundred dinars; please
kindly disburse.
a- 900/000 dinars for the annual rent after deducting the property tax, provided that the lease period is calculated from the date of occupying
the building.
b- 500/000 dinars for the cost of the partition work.
Please accept our highest respect.
Acting President of the Community
President of the Lay Council
KR
Page 180
Presidency of the Jewish Community
in Baghdad
Telephone Number 3531
5452
Number :: T / 52 / 289
Date :: 10 / 3 / 1953
Subject: Rachel Shahmoon School Building.
To -
Directorate of General Social Services
Greetings,
With reference to your letter No. 712 dated 4 / 3 / 1953;
1- We agree to lease the Rachel Shahmoon School building located in the Torah neighborhood; for occupancy by refugees at the fee approved by
the committee formed for this purpose, amounting to (1000/000) Dinars, one thousand Dinars per year, under the following two conditions:-
a- Your esteemed General Directorate undertakes; to carry out all necessary repairs and renovations it deems appropriate for the purpose of occupying the mentioned building
by the refugees; for the duration of the contract at its own expense without charging this Presidency any amount whatsoever.
b- The Presidency of the Community; shall hand over the mentioned building; complete; in terms of electrical installations, water, window glass; and cleaning.
2- As for our performance of the partitioning work according to the statement attached to your letter referred to above; at the estimated cost by you of
420/000 Dinars; please note the following:-
a- We prefer that these partitions be carried out by your esteemed General Directorate directly.
b- In case that is not possible; the amount estimated for this purpose, being (420/000) Dinars, is insufficient; in view of the report of the contractor
Alwan Mahmoud; commissioned by the Presidency of the Community to carry this out. As he requested five hundred Dinars for him to complete the required partitions
and he attributed the difference between your estimate; and his estimate; to a difference in the price of papyrus/reeds by 100 Fils per square meter and additional works; not mentioned in
the statement attached to your letter referred to above; and requested by the Director of Refugee Affairs.
We enclose herewith a copy of the mentioned contractor's report for your kind review.
3- In the event of your approval to carry out the partitioning and other works by the contractor Alwan Mahmoud for the amount of five hundred Dinars; please
kindly disburse.
a- 900/000 Dinars for the annual rent after deducting the property tax, provided that the lease period is calculated from the date of occupancy of
the building.
b- 500/000 Dinars for the cost of the partitioning work.
Please accept our highest respect
Acting Head of the Community
Chairman of the Lay Council
145
⟦Carpentry⟧
⟦illegible⟧
Page 181
The Kingdom of Iraq
Ministry of Social Affairs
Directorate of General Social Services
Division: Refugees
Number 967
Date 26 / 3 / 1953
26
2172
26 / 12 / 1952
Subject ⟦line⟧
Presidency of the Jewish Community in Baghdad .
142
Reference to your letter numbered T/ 2954 / 53 dated
10 / 3 / 1953 .
We attach herewith four copies of the lease contract for the Rachel
Shahmoon school building located in the Al-Tawrat neighborhood. Along with four copies of the prepared inspection
for this purpose .
Requesting the signature on them and returning them to us so that we may pay
the two amounts mentioned in the contract .
Dr. A. Al-Wizzy
General Director of Social Services .
A copy to :-
Accounting Division .
Page 182
(Lease Contract Agreement)
The First Party - Al-Wajih Haskil Daoud Shamtoob, President of the Jewish Lay Council in Baghdad, in addition to his official capacity.
The Second Party - The Tenant - Dr. Abdul Jabbar Al-Razali, Directorate of General Services, in addition to his official capacity.
-1 The Second Party has leased the Rachel Shahmoon School building located in the Torah neighborhood to be occupied by Palestinian refugees
and for other purposes of the Directorate for a period of one full year starting from 1/5/1953 to 30/4/1954 for an annual
rent of (1000) Dinars (one thousand Dinars) to be paid in advance to the First Party upon signing this
contract.
-2 Property tax and all due fees that will be due on the mentioned building shall be borne by the First Party, while the costs of
guarding, water, electricity, and cleaning of cesspools shall be borne by the Second Party.
-3 The Second Party undertakes to pay an amount of (500) Dinars to the First Party for the purpose of building partitions of Al-Subardi
and carrying out other repairs according to the attached organized assessment with this contract, and the Second Party shall remove these
materials supplied for this purpose upon vacating the mentioned building and dispose of them as he wishes.
-4 The First Party must deliver the building complete in terms of electrical installations, water pipes, repairing windows, installing
glass, and cleaning cesspools on 1/5/1953, and after completing the missing items intended to be carried out as
stated in the third clause. In case of delay in delivery at the specified time, an amount of five
Dinars shall be deducted for each subsequent day, provided that the delay days do not exceed fifteen days. If the
delay exceeds this period, the Second Party has the right to terminate the contract and recover the rent and the renovation advance, as well as a monetary
compensation paid by the First Party to the Second Party amounting to (500) ⟦five⟧ hundred Dinars, and the letter issued by the Second
Party on this subject shall be considered an official warning issued by the Notary Public's office.
-5 The Second Party bears the cost of repairing damages that may occur (such as breaking glass and doors during the lease period)
due to the negligence of the Second Party. As for other liabilities such as damage to roofs, subsidence of a spot in the
ground, collapse of walls, roof parapets, or failure of electrical or water installations and removing any danger
that occurs to the building during the lease period, their repair shall be on the lessor, the First Party, and he must carry that out
when instructed by the Second Party; otherwise, the Second Party has the right to carry them out and recover the costs from the First
Party.
-6 The First Party has no right to claim from the Second Party for damages that may result from natural or heavenly
disasters, and in this case, the Second Party has the right to terminate the lease or vacate it and recover the rent installment
for the remaining period of this contract.
-7 The Second Party has the right to sublease this building during the lease period provided he informs the First Party in
writing, and the First Party has the right to approve the sublease or return to the Second Party the installment for the remaining days
of the lease period.
-8 If the two parties do not agree on the lease period for another year, the Second Party must deliver the leased property to the First
Party free from all occupants when he can find another place to move to, and the rent for the period
the tenant remains after the end of this contract shall be according to the rate determined by the Immovable Property Investment Committee
at the Ministry of Finance.
- 2 -
Page 183
- 2 -
9 - Stamp duties shall be paid by the First Party.
10 - This contract was drafted in four copies, with each party holding a copy signed by both parties.
First Party | Second Party
Heskel Daoud Shuttob | Dr. Abdul Jabbar al-Razzali
President of the Israeli Lay Council in Baghdad | General Director of Social Services
In addition to his official capacity | In addition to his official capacity
Mutee/
Page 184
Presidency of the Jewish Community
in Baghdad
Telephone No. { 3531
5452
No: T/53/2972
Date: 26/3/1953
- 1 -
Subject: 147
To -
Directorate of General Social Services
Refugees Division
Greetings,
With reference to your letter No. 967 dated 26/3/1953;
After reviewing the terms contained in the lease agreement attached to your aforementioned letter;
We request the following amendments: -
1- Whereas we had agreed to lease the Rachel Shahmoon School building for the amount estimated by the competent committee, which is one thousand Dinars
annually, on the condition that your respected General Directorate undertakes all necessary repairs and renovations required for the purpose of occupying
the aforementioned building by refugees throughout the duration of the contract at its own expense, without charging this Presidency any amount whatsoever,
as per our letter No. T/53/2954 dated 10/3/1953 referred to in your aforementioned letter; accordingly,
we request to amend Clause 5 of the contract attached to your letter to read as follows: -
"The Second Party undertakes to carry out all necessary repairs and renovations deemed appropriate by the Second Party for the purpose of occupying"
"the building by refugees or for any other purpose throughout the duration of the contract at its own expense without charging the First Party any amount"
"whatsoever."
2- Amendment of Clause 8 of the contract to read as follows: -
"A- If the two parties do not agree on the lease term for another year; the Second Party must hand over the leased property to the First Party"
"vacant and in the condition in which it was received, complete in terms of electrical and water installations and window glass."
"B- The Second Party has the right to occupy the leased property for a period of three months after the expiration of this contract in the event of non-"
"agreement between the two parties on its renewal; and the consideration for the days in which the Second Party occupies the leased property shall be calculated"
"at the same rental rate agreed upon under this contract."
3- Since we preferred in our aforementioned letter No. T/53/2954; that your General Directorate undertake the task of partitions directly; and our acceptance
to carry them out at the cost estimated by your General Directorate, amounting to five hundred Dinars, was only to facilitate the matter; we do not see any
justification for the heavy restrictions mentioned in Clause 4 of the contract; therefore, we request to amend the said Clause to read as follows:
"A- The First Party shall hand over the building complete in terms of electrical installations, water pipes, window repairs, installation of"
"glass, and cleaning of septic tanks by a date no later than 15/5/1953; and after completing the deficiencies to be carried out"
"as stated in Clause 3, the lease term of this contract shall be calculated from the date of delivery - and in case of delay"
"in delivery beyond the specified date - unless the delay is due to force majeure - an amount of three"
"Dinars shall be deducted for each day of delay, provided that the days of delay do not exceed fifteen days; and if they exceed"
Page 185
Presidency of the Jewish Community
in Baghdad
Telephone Number 3531
5452
Number:
Date:
- 2 -
Subject:
delay beyond this period, and if there were no compelling reasons requiring it, the second party has the right to terminate the contract and recover
the rent amount and the renovation advance.
B - If the second party refuses to take delivery of the aforementioned building from the first party after carrying out repairs and deficiencies according to
the terms of this contract, his right to recover the renovation advance shall be forfeited, and the first party shall deduct from the received rent amount
whatever he may have spent on electrical installations, water pipes, repairing windows and glass, and cleaning the cesspool
tank ⟦line⟧.
4 - Delete the phrase (from 5/1/1953 to 4/30/1954) mentioned in the first clause of the contract and replace it with the phrase (from
the date of delivery of the building by the first party ready for occupancy by the second party, which shall be established by virtue of letters
exchanged between the two ⟦line⟧ parties).
Therefore, we return herewith the attachments of your letter referred to above, requesting that the modifications mentioned above be made and kindly returned
for signature by ⟦line⟧ us.
Please accept the highest expressions of respect
⟦signature⟧
Acting President of the Community
President of the Lay Council
Page 186
Presidency of the Jewish Community
in Baghdad
Telephone Number { 3531 / 5452 }
No: T / 53 / 2970
Date: 26 / 3 / 1953
- 1 -
Subject: 147
To:-
Directorate General of Social Services
Refugee Branch
Greetings,
With reference to your letter No. 967 dated 26 / 3 / 1953;
After reviewing the terms contained in the lease agreement attached to your aforementioned letter;
We request the following amendments:-
1 - Since we had agreed to rent the Rachel Shahmoon School building for the amount estimated by the specialized committee, which is one thousand Dinars
annually, provided that your esteemed Directorate General undertakes to carry out all necessary renovations and repairs it deems fit for the purpose of occupying
the mentioned building by refugees throughout the duration of the contract and at its own expense without charging this Presidency any amount whatsoever,
pursuant to our letter No. T / 53 / 2954 dated 10 / 3 / 1953 referred to in your aforementioned letter; accordingly,
we request to amend Clause Five of the contract attached to your letter so that it becomes as follows:-
"The Second Party undertakes to carry out all necessary renovations and repairs it deems fit - the Second Party - for the purpose of occupying"
"the building by refugees or for any other purpose throughout the duration of the contract at its own expense without charging the First Party any amount"
"whatsoever."
2 - Amend Clause Eight of the contract so that it becomes as follows:-
"A - If the two parties do not agree on the lease period for another year; the Second Party must hand over the leased property to the First Party"
"free of occupants; and in the condition in which it was received, complete in terms of electrical and water installations and window glass."
"B - The Second Party has the right to occupy the leased property for a period of three months after the expiration of this contract in case of non-"
"consent between the two parties to renew it; and the compensation shall be calculated for the days during which the Second Party occupies the leased property"
"at the same rate of rent agreed upon under this contract."
3 - Since we preferred in our aforementioned letter No. T / 53 / 2954; that your Directorate General directly handles the task of partitioning; and our acceptance
to carry them out; at the cost estimated by your Directorate General; amounting to five hundred Dinars, was only to facilitate the matter; we do not see any
reason for the heavy restrictions mentioned in Clause Four of the contract; therefore we request to amend the mentioned clause so that it becomes as follows:"
"A - The First Party must hand over the building complete in terms of electrical installations, water pipes, window repairs, installation of"
"glass, and cleaning of sewage tanks by the date of 15 / 5 / 1953 at the latest; and after completing the deficiencies to be carried out"
"as stated in Clause Three, and the rental period of this contract shall be calculated starting from the date of handover - and in case of delay"
"in handover beyond the specified date - unless the delay is for force majeure reasons - then an amount of three"
"Dinars shall be deducted for each day of delay; provided that the days of delay do not exceed fifteen days; and if they exceed"
⟦illegible⟧
Page 188
Number: 102
Date: 28 / 3 / 1953
Ministry: Social Affairs
Directorate: General Social Services
Division: Refugee Administration
148
Subject ⟦line⟧ Signing a lease agreement ⟦line⟧
To -
The Israelite Community
Reference to your letter numbered T 2972 and dated 26 / 3 / 1953
We enclose herewith four copies of the lease agreement for the Rachel Shahmoon building
located in the Torah quarter with a copy of the survey organized for this
purpose, requesting that you sign them and return them to us so that we may pay
the two amounts mentioned in the contract.
Attachment / 4 -
Dr. A. Al-Wizeli
General Director of Social Services
A copy of it to -
Accounting Division
N 28/5
To be registered with the community ⟦...⟧
29 / 3 / 53
Page 190
⟦1900⟧
⟦illegible⟧
10.00
15.75
Entrance
Entrance
10.00
10.00
Plan ⟦illegible⟧
⟦illegible⟧
⟦illegible⟧
Page 191
Model for dividing the hall into partitions
7.80 m
2.40 m
7.40 m
14.10 m
5.80 m
5.80 m
2.40 m
Entrance
2 m
14.40 m
Page 193
149
Contract
First Party - The Contractor - Alwan Mahmoud, residing in Al-Tatran district
Second Party - Heskel Dawood Shatoub, President of the Lay Council and Acting Head of the Community, in his official capacity.
1- The First Party has undertaken to the Second Party to construct reed partitions and carry out other repairs in Rachel Shahmoon School located in Al-Tawrah district, according to the inspection report organized by the Directorate General of Social Services sent under its letter No. 1020 dated 3/29/1953, a copy of which is shown below this contract. The cost of materials required in the mentioned report, labor wages, and all expenses necessary to complete this task shall be borne by the First Party for a lump sum amount of five hundred Dinars (500). The Second Party has undertaken to pay it to the First Party as detailed in Clause (3) of this contract.
2- The First Party has undertaken to the Second Party to complete the construction of the partitions and other repairs mentioned in the report attached to this contract by a deadline of 5/1/1953. In the event of delay in delivery beyond that date, the said party shall be obliged to pay an amount of five Dinars to the Second Party for each day of delay, provided that it does not exceed ten days. In case the delay exceeds ten days, the Second Party has the right to terminate this contract, and in this case, the First Party shall be obliged to return the amounts received from the Second Party on account of these works ⟦or to have them completed by the Second Party at the First Party's expense⟧.
3- The lump sum amount of five hundred Dinars (500 Dinars) which the Second Party undertook to pay to the First Party in the first clause of this contract shall be paid as follows:-
Fils | Dinar |
⟦line⟧ | 150 | Upon receipt of the restoration advance from the Ministry of Social Affairs
⟦line⟧ | 150 | When the First Party prepares all the materials needed for this task such as reed, wood, etc...
⟦line⟧ | 200 | Upon completion of the work by the First Party and its receipt by the Directorate General of Social Services and its certification that it conforms to the inspection report organized by it.
4- The First Party shall not be considered to have fulfilled the obligation mentioned in this contract until after the Directorate General of Social Services receives the work and certifies that it conforms to the inspection report organized by it. In the event that the Directorate General of Social Services does not receive the work due to its non-conformity with the mentioned report, the First Party shall be obliged to return to the Second Party all the amounts received from it, in addition to being obliged to pay all the amounts that the Second Party is obliged to pay to the Directorate General of Social Services in view of its failure to deliver the required works according to the contract concluded between them. ⟦He is also tasked with completing the deficiencies that appear within the scope of the inspection and which must be completed⟧
5- The First Party must provide the Second Party with the expenditure documents related to the restoration, partitions, and work, totaling five hundred Dinars, within one month from the date of delivering the work ⟦certified⟧
- To be continued -
Page 196
Presidency of the Jewish Community
in Baghdad
Telephone Number 3531
5452
Number: T/53/2977
Date: 2/4/1953
Subject: Rachel Shahmoon School Building.
151
To -
Directorate General of Social Services
Greetings,
With reference to your letter No. 1039 dated 30/3/1953;
We inform you of our receipt of:-
1- An amount of nine hundred Dinars (900/000 Dinars) representing the rent for the Rachel Shahmoon School building after deducting 100/000 Dinars for property tax according to the contract.
2- An amount of five hundred Dinars (500/000 Dinars) as an advance for the account of performing repairs and building the partitions agreed upon in the contract; we will send the documents related to their expenditure within the period stipulated in the aforementioned contract.
Please accept our highest respect,
Acting President of the Community
President of the Lay Council
Copy to -
Accountant of the Presidency of the Community "
a- Hand him the check No. H/186168 drawn on Rafidain Bank in the amount of 1400/000 Dinars (One thousand four hundred Dinars) received from the Directorate General of Social Services regarding the matters mentioned above. To be deposited in the Ottoman Bank in the account of the Lay Council.
b- The accounting entries are carried out as follows "
1- A special account shall be opened under the title ((Rachel Shahmoon School Building Rent Account)) in which the amount of (900/000) Dinars shall be recorded in the revenue field.
2- A special account shall be opened under the title ((Advance for repairs and building partitions in the Rachel Shahmoon School building received from the Directorate General of Social Services)). The amount of (500/000) Dinars shall be recorded in the revenue field; the advance amount of five hundred Dinars shall be paid to the contractor Alwan Mahmoud as follows:-
a- One hundred and fifty Dinars to be paid to him immediately and delivered to him against a receipt.
b- One hundred and fifty Dinars to be paid to him after preparing the work materials in the school such as wood and reeds ⟦line⟧ etc., and the aforementioned contractor delivering the documents for their expenditure.
Page 197
Presidency of the Israelite Community
in Baghdad
Telephone Number { 3531
5452
Number:
Date:
Subject:
h - Two hundred dinars upon delivery of the work by the Directorate of General Social Services and its report stating its compliance with the terms of the contract
and the delivery to the aforementioned contractor of the payment documents related to labor wages and other documents.
Page 198
Presidency of the Israelite Community
in Baghdad
Telephone number { 3531 / 5452 }
Number: 537 / ⟦illegible⟧
Date: 2 / 4 / 1953
Subject: Rachel Shahmoon School Building.
151
To -
Directorate General of Social Services
Greetings,
With reference to your letter numbered 1039 and dated 30 / 3 / 1953;
We inform you of our receipt of:
1- An amount of nine hundred Dinars (900/000 Dinars) as rent for the Rachel Shahmoon School building after deducting 100/000 Dinars for property tax according to the contract.
2- An amount of five hundred Dinars (500/000 Dinars) as an advance for the account of carrying out repairs and building partitions agreed upon in the contract; we will send the documents related to their expenditure within the period stipulated in the aforementioned contract.
Please accept our highest respect.
Acting Head of the Community
President of the Lay Council
Copy to: -
Accountant of the Community Presidency "
A- Attached is check number H / 186168 on Rafidain Bank for the amount of 1400/000 Dinars (one thousand four hundred Dinars) received from the Directorate General of Social Services for the matters mentioned above. To be deposited in the Ottoman Bank in the Lay Council account.
B- Accounting entries are to be made as follows: "
1- A special account is opened under the title ((Rachel Shahmoon School Building Rent Account)) recording the amount of (900/000) Dinars in its revenue field.
2- A special account is opened under the title ((Advance for repairs and construction of partitions in the Rachel Shahmoon School building received from the Directorate General of Social Services)). The amount of (500/000) Dinars is recorded in its revenue field; the advance amount of five hundred Dinars is to be paid to the contractor Alwan Mahmoud as follows: -
a- One hundred and fifty Dinars to be paid to him immediately and delivered to him according to a receipt.
b- One hundred and fifty Dinars to be paid to him after preparing the work materials in the school such as wood, reeds, etc. and the mentioned contractor shall be given the expenditure documents.
Page 199
Presidency of the Jewish Community
in Baghdad
Telephone Number 3531 / 5452
Number: T/200/53
Date: 13/5/1953
Subject: Rachel Shahmoon School Building
152
To -
Directorate General of Social Services
Greetings,
With reference to the lease agreement concluded between your esteemed Directorate General and this Presidency on 28/3/1953
We request you to note the following:
1 - The Presidency of this community has awarded the contract for constructing the reed partitions and other repairs mentioned in the attached survey to the
contract mentioned above, to the contractor Alwan Mahmoud for the amount estimated by your esteemed Directorate General, which is
500/000 Dinars (Five hundred Dinars) according to the contract concluded between this Presidency and the aforementioned contractor, a
copy of which is attached herewith.
Since the aforementioned contractor has completed the work according to the survey organized by your Directorate General, he has submitted to this Presidency
the list of expenditures amounting to 500/000 Dinars (Five hundred Dinars) supported by the necessary receipts, and therefore - according to
the terms of the contract - we attach herewith a copy of the aforementioned list with the five attached receipts. Please acknowledge receipt.
And since the aforementioned contractor has a remaining balance due from this Presidency, the payment of which is conditional upon an inspection of the work by you
and its compliance with the conditions, we therefore request you to kindly perform the necessary inspection and provide us with a letter stating the work's compliance with the required conditions.
2 - Based on the completion by this Presidency of all electrical and water repairs, glass, cleaning, and necessary renovations
under the supervision of the Director of Refugee Affairs in your Directorate General.
Therefore, we request you to kindly take delivery of the mentioned building in preparation for the start of the lease period from 15/5/1953 as per the terms of the contract.
Please accept our highest respect.
Heskel Dawood Shetoob
Acting Head of the Community
President of the Lay Council
Attachments:
1 - A commitment contract between this Presidency and the contractor Alwan Mahmoud.
2 - A list of expenditures submitted by the aforementioned contractor.
3 - Five receipts.
⟦signature⟧
Page 200
Presidency of the Jewish Community
in Baghdad
Number: T / 53 / 7020
Date: 13 / 5 / 1953
Telephone Number: 3531 5452
Subject: Rachel Shahmoon School Building
⟦152⟧
To -
Directorate General of Social Services
Greetings,
With reference to the lease contract concluded between your esteemed Directorate General and this Presidency on 28 / 3 / 1953,
we request you to note the following: -
1 - The Presidency of this community has awarded the undertaking for constructing reed partitions and other repairs mentioned in the survey attached to
the aforementioned contract, to the contractor Alwan Mahmoud for the amount estimated by your esteemed Directorate General, which is
500/000 Dinars (five hundred Dinars), pursuant to the contract concluded between this Presidency and the aforementioned contractor, a
copy of which is attached herewith.
Since the aforementioned contractor has completed the work according to the survey organized by your Directorate General, he has submitted to this Presidency
the list of expenses amounting to 500/000 Dinars (five hundred Dinars) supported by the necessary receipts, and therefore -
contract conditions - we attach herewith a copy of the aforementioned list with the five attached receipts; please acknowledge receipt.
Since there is a remaining amount due to the aforementioned contractor from this Presidency, conditional upon payment after a survey of the work is conducted by you
and its compliance with the conditions, we request you to kindly carry out the necessary survey and provide us with a letter stating the work's compliance with the required conditions.
2 - Based on this Presidency's completion of all electrical and water repairs, glass, cleaning, and necessary renovations
under the supervision of the Director of Refugee Affairs in your Directorate General.
Therefore, we request you to kindly take over the mentioned building as a prelude to the commencement of the lease period from 15 / 5 / 1953 according to the contract conditions.
Please accept our highest respect.
Heskel Dawood Shattub
Acting President of the Community
President of the Lay Council
Attachments:
1 - An undertaking contract between this Presidency and the contractor Alwan Mahmoud.
2 - A list of expenses submitted by the aforementioned contractor.
3 - Five receipts.