Voices from the Archive

IJA 649

Correspondence and Architectural Plans Regarding an Addition to the Jewish Cemetery, Baghdad

View interactive document page

Description

These are letters between the head of the Baghdadi Jewish community, the head of the Ḥevrah Ḳadishah (Burial Society), and engineering contractors. The correspondence includes hand drawn architectural plans about an addition to a building in the Jewish cemetery using funds from the Jewish community. There are also financial ledgers recording purchases.

Metadata

Archive Reference
IJA 649
Item Number
10565
Date
Approx. January 1, 1951 to December 31, 1960
Languages
Arabic
Keywords
Architectural Plans, Baghdadi Jewish Community, Burial Society, Correspondence, Engineering, Financial, Handwritten, Ḥevrah Ḳadishah, Jewish Cemetery, Ledger

AI English Translation, Pages 1-25

Archival unit 1

⟦134⟧
⟦illegible⟧
The engineer's papers and related matters

Archival unit 2

Control Circle
3.50 m
4.00 m
3.50 m
4.00 m
1.00 m
To the entrance of the cemetery
The rooms proposed to be built in the cemetery under
The porch (Al-Tarima)
⟦23⟧

Archival unit 3

Number
⟦...⟧
Scale 1:50
4.50
4.00
5.00
3.00
Expansion of the mortuary in the cemetery
From the outside
⟦Scale 1:50⟧

Archival unit 4

S. J. IBRAHIM
10/34 Mustansir Street - Baghdad
Tel. 83012
Office of
Engineer Saleh Youssef
10/34 Mustansir Street - Baghdad
Telephone 83012
⟦line⟧19
19......../......../........
His Excellency the President of the Jewish Community and President of the ⟦...⟧ Association, Respected
Subject: Construction of two rooms under
the newly developed floor in the cemetery
Based on your honorable order, I have prepared a plan and the costs for building the aforementioned two rooms, and the costs
are as follows:
Material | Quantity | Price | Amount
1- Construction with bricks and gypsum | ⟦...⟧ | ⟦...⟧ | ⟦...⟧
2- Cement stairs | ⟦...⟧ | ⟦...⟧ | ⟦...⟧
3- Tiled flooring | ⟦...⟧ | ⟦...⟧ | ⟦...⟧
4- Window with bars and glass | ⟦...⟧ | ⟦...⟧ | ⟦...⟧
5- Painting doors and windows | ⟦...⟧ | ⟦...⟧ | ⟦...⟧
6- Reserve | ⟦...⟧ | ⟦...⟧ | ⟦...⟧
Awaiting your order, with respect
Only one hundred and sixty Dinars
The Engineer
Saleh Youssef

Archival unit 6

The President of the Israelite Community and President of the Hebra Kadisha Society, the Respected
⟦illegible⟧ submitted ⟦illegible⟧ cadre ⟦illegible⟧
⟦illegible⟧
⟦illegible⟧ ten ⟦illegible⟧
⟦line⟧
⟦line⟧
⟦line⟧

Archival unit 7

Date: 11 / 1 / 1956
To the Honorable Head of the Jewish Community and President of the Hebra Qaddisha Society
Subject: Design of the second floor for the endowment property numbered 1/82
Based on the instructions of the accountant, Mr. Selim Kabbay, I have designed the second floor for the building
mentioned above. It will cost, as I stated in my previous letter, three thousand dinars and can be rented
in its entirety for an amount of about 500 dinars. It is suitable to be residences for families or offices for doctors, lawyers, or
engineers. The building is divided into three sections { I have colored them in three colors for easy identification }
The matter is yours to decide.
The Engineer
⟦signature⟧
Saleh

Archival unit 8

Date 7 / 2 / 1957
The Honorable President of the Israelite Community and President of the Kheira Qadish Society
Subject: Construction of a garage, warehouse, and prayer room in the cemetery
⟦line⟧
Based on your verbal order, I have prepared the necessary design and estimated the value of building a garage, warehouse,
and prayer room in the cemetery. Attached to this letter is the proposed map along with the bill of quantities, prices,
and cost.
This is for your consideration.
The Engineer
Saleh Youssef
⟦line⟧
⟦illegible⟧

Archival unit 9

Table of Quantities, Prices, and Costs
Amount | Price | Quantity and Unit | Details | No.
960 | 200 | 4.80 m3 | Foundation excavation | 1
92500 | 3700 | 25.00 m3 | Brick construction | 2
7000 | ⟦line⟧ | 70.00 m2 | Pointing | 3
85200 | 80000 | 1.065 tons | I-beams (Shayman) | 4
77000 | ⟦line⟧ | 77.00 m2 | Jack arching, bitumen, mud-straw, and tiling with mud-bricks and gutters with necessary pointing | 5
20000 | 5000 | 4 units | Wooden doors with locks and paint | 6
29900 | 1300 | 23.00 m2 | Polished concrete with squaring and damp-proofing | 7
16000 | ⟦line⟧ | Lump sum | Complete cesspit - excavation, construction, cover, and sea transport | 8
4500 | 500 | 9 points | Electrical works | 9
7000 | ⟦line⟧ | Lump sum | Extending a water pipe to the shop | 10
20000 | ⟦line⟧ | 4 units | Standard double-leaf windows with paint ⟦illegible⟧ | 11
⟦line⟧ | ⟦line⟧ | units | Corrugated iron door for the garage | 12
A reserve amount in the name of the engineer
From which first is spent ⟦illegible⟧
Only four hundred Dinars
The Engineer

Archival unit 10

Construction of a garage, warehouse, and prayer room on plot number 4/142 Tulat
Cemetery yard
Sheikh Ali Street
Entrance
Porch
Garage
Warehouse
Prayer room
(Sewer)
1.50
3.50
.25
.25
6.00
.25
3.5
.12
3.5
.12
Scale 1 : 100